Skip to content

Gas Wells: Formation Water Treatment

Installation of Pexgol pipes for the transport of formation water (gas and minerals)

Estudo de Caso Nº

64

Cliente

Canacol
Colombia

|

2018

Condições de Trabalho

Water with gas and minerals | Pressure: 15 bar | Temperature: 20°C

Solução Pexgol

Pexgol 160 mm (6”), Class 15

Aplicação

Formation water transportation

Comprimento

11 Km

Categorias

Installation of Pexgol pipes for the transport of formation water (gas and minerals)

The Challenge

Canacol together with the engineering company A.B. Projects had the mission of creating new wells for gas extraction and transporting it for distribution in Cordoba, Colombia.
Due to the high pressure for the gas transportation (above 100 bar) the client used Flexsteel (flexible pipes made of layers of polyethylene and steel). Additionally, at the exit of the wells, the gas had to be separated from the water that was underground through a turbine. But the separated water still contained traces of gas and minerals that needed to be treated once again.

Pexgol Solution

Canacol and A.B. wanted to use a reliable pipe to carry out the separation of water from surplus gases and minerals, but having used the Flexsteel pipe would have incurred on excessive expenses. Therefore they selected Pexgol thanks to its possibility of supply in long lengths, its high levels of safety and its low installation cost (versus other materials for high and low pressures).

The 11 km of pipe were installed in just one week: the uncoiling and laying of the pipes took 3 days and then the joints were connected by electrofusion and the pipes buried.

Pexgol proved once again to be an excellent solution for oil or gas wells where it is required to transport water for treatment with pressures that are below 30 bar.

Estudos de Caso Relacionados

Replacement of Carbon Steel Pipes by Pexgol Pipes for Tailing Lines.

Tailing Lines

Ambatovy
Madagascar

 | 

2017
Transport of Drinking Water in Harsh Terrain.

Potable Water Aqueduct

Acueducto y Alcantarillado de Bogotá
Colombia

 | 

2019
Lasta2 Filter Press Feed Lines

Concentrated Copper Transportation

BHP Billiton, Olympic Dam, Australia
Australia

 | 

2014
Replacing HDPE pipes with Pexgol allowed Vale to simplify operations, eliminate auxiliary equipment, and achieve a permanent installation under extreme conditions.

Comprehensive Redesign of the PumpingSystem with Pexgol at the Sossego Mine

Vale
Brazil

 | 

2024
The innovative solution from Pexgol for Anglo American Peru’s piping challenges.

Navigating extreme conditions with Pexgol’s PE-X pipes

Anglo American Perú
Peru

 | 

2023
Transportation of Bauxite Ore Slurry at 95°C / 203°F

Alumina Plant: Ore Slurry Transportation

Urals Alumina Plant – Rusal
Russia

 | 

2013