Abrasive Tailings Transport

Installation of Pexgol Pipe for the Transport of Abrasive Tailings.

Estudo de Caso Nº

83

Cliente

Pirquitas Mine
Argentina

|

2015

Condições de Trabalho

Temperature: ambient | Pressure: 3 bar

Solução Pexgol

Pexgol 180 mm (6″), class 15

Aplicação

Tailing transport

Comprimento

2 m

Categorias

Installation of Pexgol Pipe for the Transport of Abrasive Tailings.

The Challenge

Pirquitas Mine, located in the north of the Argentine territory, required the transportation of abrasive slurry composed of quartz, iron, tin, zinc and lead minerals in a 2 meter section. The old rubber coated steel pipe that was intended for that line had failed due to excess of abrasion.

The use of coated steel or plastic pipe was evaluated.

Pexgol Solution

The client finally decided to install a Pexgol pipe due to its low roughness index and strength against the abrasion presented by the fluid to be transported.

Pexgol is currently has been working 6 times more than the rubber lined steel pipe would have been. Both options were similar in cost.
For the installation, no special tools were needed as the joints were flanged. Only two joins were made.

Estudos de Caso Relacionados

Streamlining Mine Dewatering and Water Transportation with Pexgol Pipes at Cerro Negro Mine.

Overcoming Installation Hurdles and Enhancing Operational Efficiency

Newmont
Argentina

 | 

2022
Pexgol’s Role in Enhancing Guaymas Protein’s Operations.

Transition to Corrosion-Free Diesel Delivery Systems

Guaymas Protein
Mexico

 | 

2023
Installation Oof Pexgol Pipes through a Chimney for Compressed Air.

Transport of Compressed Air for Underground Mine

HMC Gold
Chile

 | 

2021
Installation of a Pexgol Elbow with Mechanical Joints to Replace HDPE.

Pexgol Elbow for Slurry Transport

Antioquia Gold
Colombia

 | 

2022
Adapting to the demands of the process: how Pexgol solves the problems of corrosion and abrasion in the extraction of palm oil.

Implementation of Pexgol Pipelines for the Transport of Muddy Water

IACSA
Colombia

 | 

2023
Installation of Pexgol Pipes for Drainage of an Underground Mine

Vertical Drain in Underground Mine

Meridian Mine - Faena El Peñón
Chile

 | 

2018