Skip to content

High Corrosion Resistance Against Brine

Pexgol Fittings for Brine Transportation at a Brazilian Chemical Company.

Estudo de Caso Nº

89

Cliente

Unipar Carbocloro
Brazil

|

2019

Condições de Trabalho

Composition: 74,8% NaCl; 0,077% NaOH; 0,002% Na2CO3; 0,853% Na2SO4; 24,33% H2O | Temperature: 77°C / 170.6°F | Flow: 69 m³/h | Pump pressure: 8 kgf/cm²

Solução Pexgol

Pexgol 125 mm (4”), Class 15

Aplicação

Brine

Comprimento

Prefabricated Elbows and Short Sections

Categorias

Pexgol Fittings for Brine Transportation at a Brazilian Chemical Company.

The Challenge

Unipar Carbocloro is a Brazilian chemical company that operates in the soda and chlorine industry. At the outputs of the brine pumps, Carbocloro used to replace its piping components at least once every 6 months. They tried several materials and not one had performed successfully. The last ones were made of nickel and yet did not last more than six months, having leakages all around. The high corrosivity of the media was the main issue to be faced.

Pexgol Solution

Pexgol’s engineering team analyzed the whole situation, suggested a new design using Pexgol pipes and accessories and nowadays the output of the pump has worked non-stop (and with no signs of probable stops) for 9 months already.

The installation, despite the solution being formed by several parts, was easy and quick. Carbocloro’s team simply based the tasks on the plans providaded by the factory.

Estudos de Caso Relacionados

Installation of Pexgol Pipe in a Formation Water Treatment Plant.

Secondary Injection Water Plant

YPF
Argentina

 | 

2020
Pexgol Pipe Installation for the Transport of Water with Solids (Feathers, Bones, Viscera, Etc.)

Transportation of Water with Solids

Kofanor
Mexico

 | 

2022
Improving drainage in the Media Luna mine with Pexgol.

Overcoming Geotechnical Challenges with Pexgol at Media Luna

Minera Media Luna
Mexico

 | 

2023
Water Drainage in Harsh Ground

Water Drainage at an Open-Cast Mine

Timmins Gold Corp Group, Molimentales del Noroeste Mine
Mexico

 | 

2016
Transport Of Palm Oil Slurry At 95°C.

Transport of Palm Oil Slurry

Loma Fresca
Colombia

 | 

2017
Installation of a Drainage System between a Well and a Mining Dam.

Well Drainage at Mining Dam

CODELCO – El Teniente Mine
Chile

 | 

2019