Skip to content

Elevating Efficiency in Hydrocarbon Exploitation

Changing carbon steel for efficiency: Pexgol PE-X pipes in Aconcagua Energía

Estudo de Caso Nº

131

Cliente

Aconcagua Energía
Argentina

|

2023

Condições de Trabalho

Temperature: 35°C / 95°F | Flow: 80 m³/hour | Pressure: 10 Kg/cm²

Solução Pexgol

Pexgol 110 mm (4″), class 24

Aplicação

Formation water

Comprimento

1280 m / 4199 ft

Categorias

Changing carbon steel for efficiency: Pexgol PE-X pipes in Aconcagua Energía

The Challenge

As an independent energy company that vertically integrates all operations, Aconcagua Energía S.A. was seeking ways to enhance efficiency in its exploration and exploitation of conventional hydrocarbons. The primary challenge lay in the management of their formation water transportation line. An existing carbon steel pipe, used for this project, faced significant corrosion due to the transport of formation water, necessitating its removal from service. The project required a piping system that could withstand the corrosive environment, perform under operational conditions, and could be installed quickly and efficiently over a distance of approximately 1280 meters (or around 4199 feet).

Pexgol Solution

Pexgol was chosen as the ideal piping solution for Aconcagua Energía S.A. A Pexgol pipe of 110 mm diameter, class 24, renowned for its high resistance to chemicals and corrosion, was provided. Despite the project’s length and the piping system’s operational conditions—35°C (95°F) temperature, 80 m³/h flow rate, and 10 Kg/cm² pressure—Pexgol pipe’s durability and performance were unflinching.

One of the main benefits of Pexgol is its ease and speed of installation. The installation was completed in two days. Each morning, with the assistance of a backhoe, each roll was extended in less than an hour. The afternoons were spent burying the pipes at road crossings.
Another advantage of Pexgol pipes is the provision of long lengths that could be transported in rolls, minimizing the need for joints and reducing installation time.

Mechanical double connectors and GP flanged couplers were used in the installation, further ensuring a secure and leak-free system.
With Pexgol pipes, Aconcagua Energía S.A. successfully upgraded its formation water transportation system, reinforcing its commitment to efficiency and productivity. The client has also expressed a desire to replace their PRFV (Fiberglass Reinforced Plastic) pipe aqueducts with PEX, given the challenges they faced during the transportation and installation of PRFV. This successful transition attests to
Pexgol’s superiority and reliability as a piping solution in the energy sector.

Estudos de Caso Relacionados

Replacement of HDPE Pipes For Pe-X to Transport Industrial Treated Water.

Industrial Waste Water to MBR Treatment Facility

Chip Manufacturer
Israel

 | 

2021
In an engineering challenge, the Pexgol 225 mm (8”) Class 15 pipe proved to be the perfect solution for transporting tailings at the Mina Capela mining complex.

Environmental Protection and Efficiency in Tailings Management

Mina Capella - Grupo Peñoles
Mexico

 | 

2023
Biodiesel Transport through the Colombian Jungle

Biodiesel Transport

Indupalma (Oro Rojo Plant)
Colombia

 | 

2012
High Pressure potable water line

High Pressure Potable Water Line

Antofagasta Minerals, Pelambres Mine
Chile

 | 

2014
Installation of Pexgol Pipes for Transporting Hot Water.

Hot Water Supply

Hilton
Israel

 | 

2020
Pexgol technology can overcome challenges in shallow well applications, offering an efficient and cost-effective solution for leading companies in the agricultural industry.

Success in Agricultural Desalination: Water Supply Challenges

BerryMex
Mexico

 | 

2019