Mineral Processing – Brine Transportation

Reduction of material build-up in brine and brine/acid lines

Case Study Nº

8

Customer

SQM,Pedro Valvidia Mine
Chile

|

2010

Working Conditions

Ambient temperature -5°C to 0°C (32°F to 23°F). High level of material build-up and corrosion inside the pipe. Working pressure: 15 bar.

Pexgol Pipes

Pexgol and elbows 160×14.6, Class 15.

Application

Brine and acid transportation.

Lenght

12 meters.

Categories

Mineral Processing - Brine Transportation

The Challenge

As the brine water and acid solution was being transported by the initial HDPE pipeline, salts were sticking to the pipe walls, reducing the inner diameter. Due to the low ambient temperatures, deposits of calcium sulfate formed on the inner wall of the pipes and on the elbows.

The matter was critical since the problem forced complete halting of work at the plant as well as lot of maintenance and reduction of production capacity.

Pexgol Solution

SQM decided to replace its HDPE pipes and elbows with Pexgol’s. Due to the especially smooth internal surface of Pexgol’s pipes and elbows, the replacement of HDPE pipes with Pexgol eliminated the problem of chemical deposits. This resulted in fewer work interruptions and improved production capacity.

The production and transportation of Pexgol’s pipes in coils also reduces the number of joints and possibility of clogging. As a result, it reduced maintenance costs and brought the end of frequent forced halts in the work processes at the plant.

The original mean time between failures (MTBF) of the HDPE pipes was one month. Since changing to Pexgol in 2010, no sign of failure has been detected.

Related Case Studies

Groundwater Transportation With Ph Low Levels

Groundwater Transportation

Grupo México, Buena Vista del Cobre Mine
Mexico

 | 

2015
Water Drainage in Harsh Ground

Water Drainage at an Open-Cast Mine

Timmins Gold Corp Group, Molimentales del Noroeste Mine
Mexico

 | 

2016
Comparative Test for the Transport of Brine with HDPE and Pexgol Pipes.

Comparison of brine transport

Albemarle Salar
Chile

 | 

2020
Replacement of Carbon Steel Pipe for a Pexgol Pipe

Water Transportation

Cargill
Mexico

 | 

2017
Replacing Steel for PE-X Pipes to Transported Processed Water.

Replacement of Steel Pipes for PE-X

Rosebel Gold Mines – IamGold
Suriname

 | 

2020
Replacement of Carbon Steel Pipes by Pexgol Pipes for Tailing Lines.

Tailing Lines

Ambatovy
Madagascar

 | 

2017