Syncrude & Pexgol: A Collaboration Set to Reshape Slurry Transport

Bridging the Gap between Durability and Functionality in Harsh Processing Environments.

Estudo de Caso Nº

148

Cliente

Syncrude
Canada

|

2022

Condições de Trabalho

Temperature: 82°C / 179°F | Pressure: 50 psi | Components of the fluid: Water, sand, bitumen, high oxygen content

Solução Pexgol

Pexgol 280 mm, class 15

Aplicação

Transport of high temperature slurry

Comprimento

10 m / 32 ft

Categorias

Syncrude & Pexgol: A Collaboration Set to Reshape Slurry Transport

The Challenge

Syncrude Canada Ltd, a leader in the synthetic crude oil industry, faces a unique challenge in its production process. The extraction of raw oil called bitumen from oil sands is an intensive operation involving the transport of high-temperature slurry, which comprises water, sand, bitumen, and high oxygen content. Their existing pipeline, made from Schedule 80 carbon steel, was proving insufficient. This line was failing prematurely – in as little as 6 months, especially in high wear areas such as elbows and horizontal runs. The principal culprits were the the combination of the erosion and the corrosion from the high oxygen content that created the unique conditions accelerating the failure time for the carbon steel.

Pexgol Solution

Pexgol, renowned for its high-grade PE-X piping systems, introduced its 280 mm, class 15 pipe to serve Syncrude’s rigorous requirements. The 10-meter pipeline was strategically designed to transport the high-temperature slurry under conditions of 82°C (179.6°F) and a pressure of 50 psi. The benefits of the Pexgol piping system – fast installation, high resistance to chemicals & corrosion, and exceptional durability – emerged as game-changers. With the added advantage of GP Flange Couplers and Pexgol Elbow fittings, the solution not only outlasted its carbon steel predecessor but also ensured a smoother, more efficient production process.

Estudos de Caso Relacionados

Replacement of HDPE Pipe for Pexgol

Slurry Transportation

Tizapa Mine
Mexico

 | 

2015
Greater operational efficiency with fewer joints and fast implementation.

Fresh Water Line Optimization in an Oil Field in Argentina

Phoenix Global Resources
Argentina

 | 

2025
Installation of Pexgol Pipe for Transportation of Mining Tailings.

Tailings Transport with 50% solids

Golden Resource Corp. – Don David Gold Mine
Mexico

 | 

2019
Pexgol Pipe Installation for Open Pit Mine Drainage.

High Pressure Dewatering in Open Pit Mine

Lundin Mining
Chile

 | 

2021
Water Extraction From Deep Wells (150 Meters)

Water Extraction from Wells

Andacollo Mine
Chile

 | 

2015
Water line feed from wells to mine

Water Lines – High Pressure Water Feed Lines

Yamana Gold, Meridian Mine
Chile

 | 

2012