Skip to content

Formation Water Transport

Transport of Formation Water with Hydrocarbons.

Estudo de Caso Nº

55

Cliente

ROCH
Argentina

|

2015

Condições de Trabalho

Formation water with traces of hydrocarbons at 40°C, ambient temperature from -10°C to 30°C

Solução Pexgol

Pexgol 110 mm (4”), Class 12

Aplicação

Formation Water Transport

Comprimento

4000 m

Categorias

Transport of Formation Water with Hydrocarbons.

The Challenge

ROCH is a private company dedicated to the exploration and exploitation of hydrocarbons. As part of their production plans, it was necessary to produce and treat formation water which will then be injected through injection wells for secondary recovery. The purpose of secondary recovery is to maintain reservoir pressure and facilitate the displacement of hydrocarbons to the HC producing well.

The specific challenge was not only to find a pipe material that could support the composition of the fluid, but also to solve the following situations:

– Both the workforce and the heavy equipment, in Santa Cruz (Argentina), are very expensive and represent a very significant portion of the total cost of putting a line of production to work.

– The line had to cross a field belonging to the businessman Benetton, in which sheep are raised to produce wool that is used for his clothes business. Benetton did not allow trenches to remain open during the night (for fear that the animals could fall inside). This situtation, forced to work on sections, opening the trench, installing the pipeline and refilling the trench on the same day.

The pipe options that were handled were steel, HDPE and PE-X.

Pexgol Solution

ROCH decided to install PE-X.

With Pexgol the installation cost dropped drastically reducing the number of operators and their qualifications (no need for professional welders).

In addition, the equipment for the laying of the pipeline is light and not very sophisticated: only a backhoe is used. When installing steel pipes, for example, special equipment must be used.

Furthermore, not only allowed to make a much faster installation, but installation could also be carried out with fewer joints. Both the steel and the HDPE would have required 333 connections and with Pexgol only 13 were eventually needed. This saved costs, labor and time.

The installation was quick and easy despite the harsh weather conditions, and did not require any special tools or equipment.

Regarding the problem of the trenches, Pexgol turned out to be the ideal solution due to the ease and rapidity of laying many meters of pipe in a short time (due to its presentation in rolls).

Estudos de Caso Relacionados

Installation of a Pexgol Line for the Transport of Formation Water in an Oil Company.

Replacement of Metal Pipe with PE-X for Formation Water

Enap Sipetrol Ecuador
Ecuador

 | 

2022
Installation of a Borehole with Pipe in Sections for Reduced Space.

Installation of Water Well in Reduced Space

Mekorot
Israel

 | 

2020
Transport of Drinking Water in Harsh Terrain.

Potable Water Aqueduct

Acueducto y Alcantarillado de Bogotá
Colombia

 | 

2019
Installation of Pexgol Pipe to Transport Brine at High Pressure in a Borehole.

Transporting Brine at High Pressure

Mekorot
Israel

 | 

2020
Water Drainage in Harsh Ground

Water Drainage at an Open-Cast Mine

Timmins Gold Corp Group, Molimentales del Noroeste Mine
Mexico

 | 

2016
Pexgol technology can overcome challenges in shallow well applications, offering an efficient and cost-effective solution for leading companies in the agricultural industry.

Success in Agricultural Desalination: Water Supply Challenges

BerryMex
Mexico

 | 

2019