Pexgol’s Pipe Solution Enhances Salmon Farming

Improving the efficiency of salmon farming with the superior solution of Pexgol pipes.

Estudo de Caso Nº

136

Cliente

Mowi
Chile

|

2021

Condições de Trabalho

Temperature: 10°C / 50°F | Flow: 4 tons per day | Pressure: 1 bar

Solução Pexgol

Pexgol 90 mm, Class 12

Aplicação

Aquaculture (salmon feeding)

Comprimento

1300 m / 4265 ft

Categorias

Improving the efficiency of salmon farming with the superior solution of Pexgol pipes.

The Challenge

Mowi ASA, a Norwegian seafood company specializing in salmon farming, operates in various countries globally. Their operations span Norway, Scotland, Canada, the Faroe Islands, Ireland, and Chile. In one of their Chilean locations, they encountered significant difficulties with their existing High-Density Polyethylene (HDPE) feeding lines.

The HDPE pipes were supposed to last an entire farming cycle, approximately 16 months. However, they would often break around the eighth month. This issue led to constant repairs and loss of food due to the ruptures, impacting efficiency and productivity in their operations. To address this, Mowi ASA decided to conduct a trial at one of their farms, replacing half of their feeding lines with Pexgol pipes and leaving the remaining half with HDPE.

The Solution

Pexgol provided a class 12, 90mm pipe for the project, amounting to a total of 1300 meters. The pipes were used in an aquaculture application specifically for feeding salmon at sea, with a daily flow of 4 tons of food pellets at a temperature of 10°C and pressure of 1 bar.

The trial results were resoundingly successful. While the HDPE pipes continued to break after the eighth month, the Pexgol pipes remained intact throughout the farming cycle. This victory attested to the long lifespan and flexibility of the Pexgol pipes, making them a more efficient and cost-effective solution.

As a result of the successful trial, Mowi ASA chose to continue the test in another cultivation center, further solidifying Pexgol’s role in transforming their operations.

Estudos de Caso Relacionados

Pexgol Pipe Installation for Open Pit Mine Drainage.

Efficient Open Pit Mine Drainage

BHP Escondida Mine
Chile

 | 

2022
Test Installation for Transporting Silica Sand.

Transport of Silica Arena: HDPE vs Pexgol

Covia Corp
Mexico

 | 

2019
Dry Gas Line for Pump Activation.

Dry Gas Transportation

ExxonMobil
Argentina

 | 

2020
Record-time intervention that avoided operational losses in a dehydration plant.

Critical Pipeline Replacement in Dehydration Plant with Operational Continuity

Petróleos Sudamericanos
Argentina

 | 

2025
Replacement of Carbon Steel Pipes by Pexgol for Fire Fighting Network.

Water Transport for Fire Network

Profertil
Argentina

 | 

2022
Bridging the Gap between Durability and Functionality in Harsh Processing Environments.

Syncrude & Pexgol: A Collaboration Set to Reshape Slurry Transport

Syncrude
Canada

 | 

2022