Skip to content

High Corrosion Resistance Against Brine

Pexgol Fittings for Brine Transportation at a Brazilian Chemical Company.

Estudo de Caso Nº

89

Cliente

Unipar Carbocloro
Brazil

|

2019

Condições de Trabalho

Composition: 74,8% NaCl; 0,077% NaOH; 0,002% Na2CO3; 0,853% Na2SO4; 24,33% H2O | Temperature: 77°C / 170.6°F | Flow: 69 m³/h | Pump pressure: 8 kgf/cm²

Solução Pexgol

Pexgol 125 mm (4”), Class 15

Aplicação

Brine

Comprimento

Prefabricated Elbows and Short Sections

Categorias

Pexgol Fittings for Brine Transportation at a Brazilian Chemical Company.

The Challenge

Unipar Carbocloro is a Brazilian chemical company that operates in the soda and chlorine industry. At the outputs of the brine pumps, Carbocloro used to replace its piping components at least once every 6 months. They tried several materials and not one had performed successfully. The last ones were made of nickel and yet did not last more than six months, having leakages all around. The high corrosivity of the media was the main issue to be faced.

Pexgol Solution

Pexgol’s engineering team analyzed the whole situation, suggested a new design using Pexgol pipes and accessories and nowadays the output of the pump has worked non-stop (and with no signs of probable stops) for 9 months already.

The installation, despite the solution being formed by several parts, was easy and quick. Carbocloro’s team simply based the tasks on the plans providaded by the factory.

Estudos de Caso Relacionados

Water Transportation through Shafts

Open Cast Mine Dewatering

Agnico Eagle Pinos Altos Mine
Mexico

 | 

2017
Pexgol Fittings for Brine Transportation at a Brazilian Chemical Company.

High Corrosion Resistance Against Brine

Unipar Carbocloro
Brazil

 | 

2019
High-pressure water transport for the Southern Pit in a copper and zinc mine.

High-pressure fluid transport

Minera Antapaccay
Peru

 | 

2023
850 Meters of Pipe Replaced in Less Than 24 Hours, Without Affecting Residents.

Goodbye Asbestos: Pexgol Modernizes Thermal Water Network

Raquet Club Lake Chapala
Mexico

 | 

2024
Pexgol Pipe for the Transport of Fluorosilicic Acid.

Fluorosilicic Acid Transport

Phosphate Mine – ICL Rotem
Israel

 | 

1995
In an engineering challenge, the Pexgol 225 mm (8”) Class 15 pipe proved to be the perfect solution for transporting tailings at the Mina Capela mining complex.

Environmental Protection and Efficiency in Tailings Management

Mina Capella - Grupo Peñoles
Mexico

 | 

2023