Mining Drainage Lines

Installation of 1000 Meters of PE-X Pipe for an Underground Mine.

Estudo de Caso Nº

72

Cliente

Lundin Mining – Alcaparosa Mine
Chile

|

2019

Condições de Trabalho

Underground work

Solução Pexgol

Pexgol 160 mm (6”), class 19

Aplicação

Dewatering

Comprimento

1000 m / 3280 ft

Categorias

Installation of 1000 Meters of PE-X Pipe for an Underground Mine.

The Challenge

Lundin Mining at Alcaparosa Mine had to install a drainage line for its underground mine, where the main problem they faced was lack of time. They needed a non-invasive installation of the pipeline in order to allow the continuity of the mining operation and get back to work in the shortest time possible.

Pexgol Solution

The client decided to install 1000 meters of Pexgol pipe that was supplied in two coils of 500 meters each.
Cross-linked polyethylene was chosen because of:

  • Its long-length supply format.
  • Ease of installation, thanks to the flexibility of the pipe that was easy to accommodate in the curves of the interior of the mine.
  • Short installation time to avoid stopping the mining operation.

Installation was quick and easy, uncoiling the full length of the pipeline and then dragging it into the mine.

Estudos de Caso Relacionados

Water transportation with sulfide and cobalt particles

Water and Sulfide Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2015
Pipe installation on a mountain

Meltdown Water Transport

Codelco Andina, TADA 1-2 Project
Chile

 | 

2013
A Case Study on the Collaborative Engineering and Strategic Implementation of the Pexgol Pipeline System for Public Safety and Efficiency

Innovation in Safety: Pexgol Piping System for LPG Supply

Rawabi City
Israel

 | 

2010
Test Of Pexgol Pipes Vs Hdpe Pipes For Brine Transportation

Test: Pexgol vs HDPE for Brine Transportation

YBL
Bolivia

 | 

2017
Transportation of Phosphoric acid in a potassium nitrate plant

Transportation of Phosphoric Acid

Haifa Chemicals
Israel

 | 

1995
Transport Of Palm Oil Slurry At 95°C.

Transport of Palm Oil Slurry

Loma Fresca
Colombia

 | 

2017