Transport of Lime Slurry

Transport Of Lime Slurry At 100°C

Estudo de Caso Nº

28

Cliente

Minas de Oro Nacional, Mulatos Mine
Mexico

|

2015

Condições de Trabalho

Extreme transportation temperature (100°C).

Solução Pexgol

Pexgol 90 mm (SDR 7.4).

Aplicação

Lime slurry transportation.

Comprimento

150 m.

Categorias

Transport Of Lime Slurry At 100°C

The Challenge

The client needed to transport lime slurry, which is highly fouling due to the high temperatures and the liquid consistency. The lime slurry was transported at 100°C, damaging all metals and plastics that were not resistant enough. The fouling caused a considerable diminution on the inside diameter of the former pipe, sometimes even closing it completely. Previously the client used to work with a rubber hose, but due to the extreme conditions, and the lack of a flat inside surface, it wasn’t enough to prevent the accumulation.

Pexgol Solution

Golan provided 50 meters of Pexgol 90 mm pipe (3” – SDR 7.4). The installation was easy due to the one section pipe, that didn’t require joints. The natural curve radio was utilized to pass all the obstacles during the installation. Pexgol pipes proved to be the best solution, thanks to it’s high resistant to abrasion, corrosion, encrustation and resistance to high temperatures.

The client saved costs; formerly the rubber hose cost 6 times more than Pexgol. In the other hand, the MTBF was just two month.

Since the Pexgol pipe installation no maintenance has been required, not even plant stops.

Estudos de Caso Relacionados

Replacement of HDPE Pipe for Pexgol

Slurry Transportation

Tizapa Mine
Mexico

 | 

2015
Moving from PVC to Pexgol: Ensuring Efficiency in Lithium Production

Optimization of Lithium Brine Transportation

Puna Mining
Argentina

 | 

2022
Pexgol’s chemical resistance and flexibility outperform HDPE in demanding leach pad operations.

Greater Efficiency and Safety in Leaching with Pexgol Pipes

Barrick Gold Corp.
Argentina

 | 

2025
Dewatering With Low Ph Levels

Open Cast Mine Dewatering

Arcelor Mittal Mine
Mexico

 | 

2016
600 Meters Installed in a Day: Pexgol Delivers for Kiewit in Power Project.

Pexgol Ensures Water Supply at Mexican Combined-Cycle Power Plant

Kimex
Mexico

 | 

2025
Transport of acid water at high temperatures

Water Transport with Low pH Level

Moa Nickel S.A. Sherritt
Cuba

 | 

2010