Working Conditions

Temperature: 20°C | Pressure: 8 kg/cm² | Fluid: Gaseous nitrogen

Pexgol Pipes

Pexgol 110 mm (4”), Class 15

Application

Nitrogen

Lenght

2.2 km

Categories

Nitrogen Transport in a Complex Industrial Environment

The Challenge

YPF, Argentina’s leading energy company with integrated operations in exploration, production, refining, and commercialization of hydrocarbons, required the development of a new pipeline to transport nitrogen from Petroquímica Cuyo to its industrial operations at the Luján de Cuyo Refinery in Mendoza, Argentina.

The project demanded a reliable solution capable of operating with gaseous nitrogen at 20°C and 8 kg/cm² within a highly demanding industrial environment.

The main challenge was the pipeline routing. The line needed to cross the refinery from west to east, a complex task due to numerous existing interferences and strict safety protocols inherent to an active industrial facility.

Additionally, the total length of the project—2.2 km—required an efficient execution strategy to minimize intervention times and ensure a safe installation without disrupting ongoing refinery operations.

The Solution

For this project, Pexgol 110 mm Class 15 was selected as the optimal piping solution. Key advantages included fast installation, high chemical and corrosion resistance, long service life, and material flexibility.

The lightweight nature of the pipe, combined with the ability to supply it in long continuous coils, significantly reduced the number of joints required on site. This allowed the pipeline to be adapted efficiently to the refinery’s complex layout, optimizing maneuverability and minimizing interference during installation.

The system incorporated electrofusion couplers, loose flanges, and flared ends / stub ends, ensuring a reliable and secure connection throughout the pipeline.

Thanks to careful planning and the operational advantages of the Pexgol system, the full 2.2 km pipeline was installed in just 10 days.

As a final stage, a pneumatic integrity test at 3.5 kg/cm² was successfully performed, ensuring complete tightness of the system prior to commissioning.

The result was a safe, efficient, and reliable solution for nitrogen transport within one of Argentina’s main refineries, once again demonstrating Pexgol’s capability to perform in applications where installation speed, flexibility, and operational safety are critical.

Related Case Studies

Replacement of a Drainage Line in an Underground Mine.

Дренаж в подземном руднике

Atacama Kozan
Чили

 | 

2019
Транспортировка воды более чем на 150 карьерных транспортных развязках

Транспортировка воды на транспортных развязках

Компания Doña Inés de Collahuasi SCM, шахта Collahuasi
Чили

 | 

2012
A Case Study on the Collaborative Engineering and Strategic Implementation of the Pexgol Pipeline System for Public Safety and Efficiency

Innovation in Safety: Pexgol Piping System for LPG Supply

Rawabi City
Israel

 | 

2010
Транспортировка пластовой воды с углеводородами.

Транспортировка пластовой воды

ROCH
Аргентина

 | 

2015
600 Meters Installed in a Day: Pexgol Delivers for Kiewit in Power Project.

Pexgol Ensures Water Supply at Mexican Combined-Cycle Power Plant

Kimex
Mexico

 | 

2025
Транспортировка воды c сульфидными и кобальтовыми частицами

Транспортировка воды и сульфидов

Компания Moa Nickel S.A. Sherritt
Куба

 | 

2015