Nitrogen Transport in a Complex Industrial Environment

Pexgol enabled a safe and efficient installation across a highly constrained refinery layout.

Case Study Nº

190

Customer

YPF
Argentina

|

2025

Working Conditions

Temperature: 20°C | Pressure: 8 kg/cm² | Fluid: Gaseous nitrogen

Pexgol Pipes

Pexgol 110 mm (4”), Class 15

Application

Nitrogen

Lenght

2.2 km

Categories

Nitrogen Transport in a Complex Industrial Environment

The Challenge

YPF, Argentina’s leading energy company with integrated operations in exploration, production, refining, and commercialization of hydrocarbons, required the development of a new pipeline to transport nitrogen from Petroquímica Cuyo to its industrial operations at the Luján de Cuyo Refinery in Mendoza, Argentina.

The project demanded a reliable solution capable of operating with gaseous nitrogen at 20°C and 8 kg/cm² within a highly demanding industrial environment.

The main challenge was the pipeline routing. The line needed to cross the refinery from west to east, a complex task due to numerous existing interferences and strict safety protocols inherent to an active industrial facility.

Additionally, the total length of the project—2.2 km—required an efficient execution strategy to minimize intervention times and ensure a safe installation without disrupting ongoing refinery operations.

The Solution

For this project, Pexgol 110 mm Class 15 was selected as the optimal piping solution. Key advantages included fast installation, high chemical and corrosion resistance, long service life, and material flexibility.

The lightweight nature of the pipe, combined with the ability to supply it in long continuous coils, significantly reduced the number of joints required on site. This allowed the pipeline to be adapted efficiently to the refinery’s complex layout, optimizing maneuverability and minimizing interference during installation.

The system incorporated electrofusion couplers, loose flanges, and flared ends / stub ends, ensuring a reliable and secure connection throughout the pipeline.

Thanks to careful planning and the operational advantages of the Pexgol system, the full 2.2 km pipeline was installed in just 10 days.

As a final stage, a pneumatic integrity test at 3.5 kg/cm² was successfully performed, ensuring complete tightness of the system prior to commissioning.

The result was a safe, efficient, and reliable solution for nitrogen transport within one of Argentina’s main refineries, once again demonstrating Pexgol’s capability to perform in applications where installation speed, flexibility, and operational safety are critical.

Related Case Studies

Installation of Pexgol Pipes to Transport Fish.

Fish Discharge Lines

TASA
Peru

 | 

2018

Categories:

Replacement of Carbon Steel Pipe for a Pexgol Pipe

Water Transportation

Cargill
Mexico

 | 

2017
Pexgol pipe was selected for the Assembly of a Muddy Water Transport Line for a Palm Oil Processing Company.

Efficient Choice: PE-X Pipe for the Palm Industry

Extractora Monterrey
Colombia

 | 

2023
Installation of a New Pexgol Pipeline to Provide Cold Water for a External Chiller System.

Cold Water Distribution for External Cooler System

Chip Manufacturer
Israel

 | 

2022
Installation of a Borehole with Pipe in Sections for Reduced Space.

Installation of Water Well in Reduced Space

Mekorot
Israel

 | 

2020
Drainage in Underground Mine with Slopes Between 40° and 90°.

Water Drainage in Underground Mine

NEMISA Mine
Mexico

 | 

2018