Skip to content

Nitrogen Transport in a Complex Industrial Environment

Pexgol enabled a safe and efficient installation across a highly constrained refinery layout.

Case Study Nº

190

Customer

YPF
Argentina

|

2025

Working Conditions

Temperature: 20°C | Pressure: 8 kg/cm² | Fluid: Gaseous nitrogen

Pexgol Pipes

Pexgol 110 mm (4”), Class 15

Application

Nitrogen

Lenght

2.2 km

Categories

Nitrogen Transport in a Complex Industrial Environment

The Challenge

YPF, Argentina’s leading energy company with integrated operations in exploration, production, refining, and commercialization of hydrocarbons, required the development of a new pipeline to transport nitrogen from Petroquímica Cuyo to its industrial operations at the Luján de Cuyo Refinery in Mendoza, Argentina.

The project demanded a reliable solution capable of operating with gaseous nitrogen at 20°C and 8 kg/cm² within a highly demanding industrial environment.

The main challenge was the pipeline routing. The line needed to cross the refinery from west to east, a complex task due to numerous existing interferences and strict safety protocols inherent to an active industrial facility.

Additionally, the total length of the project—2.2 km—required an efficient execution strategy to minimize intervention times and ensure a safe installation without disrupting ongoing refinery operations.

The Solution

For this project, Pexgol 110 mm Class 15 was selected as the optimal piping solution. Key advantages included fast installation, high chemical and corrosion resistance, long service life, and material flexibility.

The lightweight nature of the pipe, combined with the ability to supply it in long continuous coils, significantly reduced the number of joints required on site. This allowed the pipeline to be adapted efficiently to the refinery’s complex layout, optimizing maneuverability and minimizing interference during installation.

The system incorporated electrofusion couplers, loose flanges, and flared ends / stub ends, ensuring a reliable and secure connection throughout the pipeline.

Thanks to careful planning and the operational advantages of the Pexgol system, the full 2.2 km pipeline was installed in just 10 days.

As a final stage, a pneumatic integrity test at 3.5 kg/cm² was successfully performed, ensuring complete tightness of the system prior to commissioning.

The result was a safe, efficient, and reliable solution for nitrogen transport within one of Argentina’s main refineries, once again demonstrating Pexgol’s capability to perform in applications where installation speed, flexibility, and operational safety are critical.

Related Case Studies

Water Drainage in Harsh Ground

Water Drainage at an Open-Cast Mine

Timmins Gold Corp Group, Molimentales del Noroeste Mine
Mexico

 | 

2016
Transportation of water with solids from an open cast mine

Open Cast Mine Dewatering

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2013
Sewage Water Transportation with 300 PPM Hydrogen Peroxide

Sewage Water Transportation

BorsodChem
Hungary

 | 

2011
Installation of Buried Pipes to Transport Water on a Mining Road.

Water Transportation on a Mining Road

CODELCO – Andina Mine
Chile

 | 

2019
Trial Demonstrates Superior Wear Resistance in Sea Water + Ash Slurry Conditions.

Unmatched Durability in Harsh Slurry: Pexgol Outperforms Steel

Tata Power
India

 | 

2023
Overcoming Corrosion Challenges in the Oil Industry

Overcoming Corrosion Challenges in the Oil Industry

Petróleos Sudamericanos
Argentina

 | 

2023