Skip to content

Nitrogen Transport in a Complex Industrial Environment

Pexgol enabled a safe and efficient installation across a highly constrained refinery layout.

Estudo de Caso Nº

190

Cliente

YPF
Argentina

|

2025

Condições de Trabalho

Temperature: 20°C | Pressure: 8 kg/cm² | Fluid: Gaseous nitrogen

Solução Pexgol

Pexgol 110 mm (4”), Class 15

Aplicação

Nitrogen

Comprimento

2.2 km

Categorias

Nitrogen Transport in a Complex Industrial Environment

The Challenge

YPF, Argentina’s leading energy company with integrated operations in exploration, production, refining, and commercialization of hydrocarbons, required the development of a new pipeline to transport nitrogen from Petroquímica Cuyo to its industrial operations at the Luján de Cuyo Refinery in Mendoza, Argentina.

The project demanded a reliable solution capable of operating with gaseous nitrogen at 20°C and 8 kg/cm² within a highly demanding industrial environment.

The main challenge was the pipeline routing. The line needed to cross the refinery from west to east, a complex task due to numerous existing interferences and strict safety protocols inherent to an active industrial facility.

Additionally, the total length of the project—2.2 km—required an efficient execution strategy to minimize intervention times and ensure a safe installation without disrupting ongoing refinery operations.

The Solution

For this project, Pexgol 110 mm Class 15 was selected as the optimal piping solution. Key advantages included fast installation, high chemical and corrosion resistance, long service life, and material flexibility.

The lightweight nature of the pipe, combined with the ability to supply it in long continuous coils, significantly reduced the number of joints required on site. This allowed the pipeline to be adapted efficiently to the refinery’s complex layout, optimizing maneuverability and minimizing interference during installation.

The system incorporated electrofusion couplers, loose flanges, and flared ends / stub ends, ensuring a reliable and secure connection throughout the pipeline.

Thanks to careful planning and the operational advantages of the Pexgol system, the full 2.2 km pipeline was installed in just 10 days.

As a final stage, a pneumatic integrity test at 3.5 kg/cm² was successfully performed, ensuring complete tightness of the system prior to commissioning.

The result was a safe, efficient, and reliable solution for nitrogen transport within one of Argentina’s main refineries, once again demonstrating Pexgol’s capability to perform in applications where installation speed, flexibility, and operational safety are critical.

Estudos de Caso Relacionados

Work with High Pressures and Extreme Ambient Temperature

Water Transport in Copper Mine

Zaldivar SPA Mine
Chile

 | 

2018
Greater operational efficiency with fewer joints and fast implementation.

Fresh Water Line Optimization in an Oil Field in Argentina

Phoenix Global Resources
Argentina

 | 

2025
The Robust & Flexible Answer to Constantly Changing Mine Surfaces.

Evolving Mine Operations with Pexgol Piping

Peña Colorada
Mexico

 | 

2023
Corrosion-resistant, lightweight piping for challenging mining environment.

Pexgol Enhances Lithium Brine Well Testing Manifolds

Gaana Servicios Mineros
Argentina

 | 

2024
Installation of a Pexgol Elbow with Mechanical Joints to Replace HDPE.

Pexgol Elbow for Slurry Transport

Antioquia Gold
Colombia

 | 

2022
Potable Water Supply on Harsh Terrain

Potable Water Supply on Harsh Terrain

Mekorot / Beit Shemesh Water Company
Israel

 | 

2017