Skip to content

2,900 Meters of Pexgol Installed and Pressure-Tested in Just 3 Days

Pexgol reduced the number of joints, accelerated installation, and improved network reliability.

Caso de Estudio Nº

195

Cliente

Petróleos Sudamericanos
Argentina

|

2026

Condiciones Operativas:

Operating pressure: 6 kg/cm² / 85 psi | Temperature: 30°C / 86°F | Flow rate: 40,000 m³/day | Transported material: Treated methane gas, 100% dry

Tuberías Utilizadas:

Pexgol 110 mm, Class 10

Uso:

Dry gas / treated methane transportation

Largo:

2,900 m / 9,514 ft

Categorías:

2,900 Meters of Pexgol Installed and Pressure-Tested in Just 3 Days

The Challenge

Petróleos Sudamericanos S.A., an energy company with more than 30 years of experience in oil and gas exploration and production, needed to replace an existing dry gas transportation pipeline in Catriel, Río Negro, Argentina.

The previous carbon steel pipeline had been in service for many years and was showing signs of corrosion and wear. To ensure operational continuity and improve system reliability, the client required an alternative capable of transporting treated methane gas, 100% dry, under operating conditions of 6 kg/cm² pressure, a temperature of 30°C / 86°F, and a flow rate of 40,000 m³/day.

In addition to material resistance, the project required an efficient installation process with fewer joints and shorter field execution times.

The Solution

For this project, 2,900 m / 9,514 ft of 110 mm, Class 10 Pexgol pipe were installed for dry gas transportation.

Thanks to its flexibility, low weight, and availability in long sections, Pexgol made it possible to complete the installation and pneumatic pressure test in just three days. Only six joints were required along the entire 2.9 km / 1.8 mi pipeline, significantly reducing critical points and improving network safety.

Pexgol’s corrosion resistance, ease of handling, and long service life made it an ideal solution for replacing the existing metallic pipeline.

This was the contractor’s second project using Pexgol. After gaining experience with the material during the first installation, the contractor selected Pexgol again due to its ease of installation and operational advantages over traditional piping solutions.

Casos de Estudio Relacionados

La propuesta de Pexgol fue clara: proporcionar una tubería que mostrara una resistencia superior al desgaste, estimada en ser tres veces más duradera que el HDPE.

Transformando el Transporte de Relaves: La Ventaja de Pexgol

Lundin Mining
Chile

 | 

2021
Reemplazo de una Tubería HDPE por Pexgol

Transporte de Jales

Mina Sabinas
México

 | 

2017
Extracción de Agua de Piscina Intermedia al Exterior de la Mina

Desagüe en Rajo Minero

Codelco, División Ministro Hales
Chile

 | 

2016
Instalación de Tubería Pexgol para el Transporte de Agua Cianurada.

Transporte de Agua Cianurada

Equinox Gold
México

 | 

2022
Transporte de Salmuera desde el Mar Muerto hasta la Estación Principal de Bombeo

Trasporte de Salmuera en Condiciones Extremas

Dead Sea Works
Israel

 | 

1993
Instalación de un Sistema de Drenaje en una Mina de Rajo Abierto.

Sistema de Drenaje

BHP Pampa Norte – Mina Cerro Colorado
Chile

 | 

2020