Fewer Shutdowns, Greater Efficiency: Pexgol in the Salt Industry

Pexgol extends pipe lifespan and reduces maintenance in salt production.

Case Study Nº

173

Customer

Sales del Istmo
Mexico

|

2023

Working Conditions

Temperature: 80°C / 176°F | Pressure: 4 bar

Pexgol Pipes

Pexgol 6″, SDR 11

Application

Liquor transport

Lenght

12 m / 40 ft

Categories

Fewer Shutdowns, Greater Efficiency: Pexgol in the Salt Industry

The Challenge

Sales del Istmo (SISA), a producer of iodized and fluoridated salt in Veracruz, Mexico, was facing recurring issues with scaling inside their stainless steel pipes used to transport mother liquor—a solution with a high concentration of rock salt dissolved in water.

This scaling led to frequent pipe blockages, causing repeated shutdowns for maintenance or pipe replacement. Plant personnel were forced to strike the stainless steel pipes to restore flow, which accelerated wear and increased operational costs.

The company needed a solution that would extend the service life of the pipelines and prevent costly production interruptions.

The Solution

To tackle this issue, Sales del Istmo decided to install a 12-meter section of 6” Pexgol SDR 11 pipe, aiming to reduce scaling and increase uptime.

Thanks to its molecular structure and low internal roughness, Pexgol prevents buildup and ensures consistent flow.

Test Results
After 9 months of continuous operation, the pipe was dismantled and found to be completely free of scaling, proving its effectiveness under operating conditions of 4 bar (58 psi) and 80°C (176°F).

Installation Process

  • The installation was carried out with the support of the plant’s internal team, without requiring a crane to lift the pipe to the upper structure.
  • Despite having no prior experience with plastic piping, the team was able to cut and assemble the GP flanged couplings in record time.

Thanks to this successful implementation, Sales del Istmo has significantly reduced maintenance costs, minimized production downtime, and improved operational efficiency with a reliable and long-lasting solution.

Related Case Studies

Монтаж линии Pexgol на глубине 200 метров в подземном руднике

Транспортировка сжатого воздуха

Рудник Meridian — Faena El Peñón
Чили

 | 

2018
Осушение шахты в условиях высокого давления

Осушение шахты — в условиях высокого давления

Antofagasta Minerals, шахта «Михилья»
Чили

 | 

2011
Installation Oof Pexgol Pipes through a Chimney for Compressed Air.

Transport of Compressed Air for Underground Mine

HMC Gold
Chile

 | 

2021
How Pexgol Accelerated the Supply and Installation of a Critical Line.

Comprehensive Water Transportation Solution for Urgent Projects

Madagascar Mining
Madagascar

 | 

2024
Линия питьевой воды высокого давления

Линия питьевой воды высокого давления

Компания Antofagasta Minerals, шахта Pelambres
Чили

 | 

2014
Транспортировка питьевой воды по пересеченной местности.

Водопровод питьевой воды

Acueducto y Alcantarillado de Bogotá
Колумбия

 | 

2019