Working Conditions

Temperature: 20°C / 68°F | Pressure: 10 kg/cm²

Pexgol Pipes

Pexgol 160 mm, class 15

Application

Aqueduct

Lenght

850 m / 2788 ft

Categories

“Threading” Pexgol Pipes

The Challenge

Pluspetrol, an international company with extensive experience in oil and gas exploration and production, faced a significant problem with one of its water pipelines in Argentina. The existing carbon steel pipe, used to transport fresh water, showed evident signs of wear due to corrosion and blockages caused by scaling, compromising the efficiency and safety of the water distribution system.

The Solution

To address these issues, Pluspetrol decided to replace the existing pipe with 160 mm, class 15 Pexgol pipe, extending over 850 meters. Pexgol was chosen due to its high resistance to corrosion and its ability to resist scaling, in addition to its lightness and ease of handling, which allow for quick transport and installation.

The installation of the new pipe was carried out over a period of two weeks. During this time, a specialized procedure was developed to integrate the Pexgol pipe within the existing steel structure every 220 meters. A specific tool was
designed to advance and dismantle blockages caused by scaling, working in coordination with the municipality to ensure compliance with all necessary permits.

The implementation of the Pexgol piping system in Pluspetrol’s aqueduct offered multiple benefits. The rapid installation and flexibility of the material allowed for efficient integration without significantly disrupting daily
operations. Pexgol pipe, known for its durability and corrosion resistance, promises a long lifespan and a notable reduction in maintenance costs.

Additionally, the use of connections such as the double mechanical connector and flanged coupling ensured a safe and effective installation, adapted to the technical demands of the project.

Related Case Studies

Линия питьевой воды высокого давления

Линия питьевой воды высокого давления

Компания Antofagasta Minerals, шахта Pelambres
Чили

 | 

2014
Case Study: Pexgol’s Solution at the Palm Oil Plant.

Efficiency and Durability in Handling Muddy Water

Industrial Aceitera del Casanare
Colombia

 | 

2023
Монтаж труб Pexgol для транспортировки абразивных хвостов.

Транспортировка абразивных хвостов

Рудник Пиркитас
Аргентина

 | 

2015
Оптимизация дренажа шахт и транспортировки воды с помощью труб Pexgol на руднике Cerro Negro.

Преодоление препятствий при установке и повышение операционной эффективности

Newmont
Аргентина

 | 

2022
A high-precision maneuver enabled the complete assembly of the system in record time, ensuring safety and operational continuity.

Pexgol Overcomes Extreme Dewatering Conditions in La Ciénega

Fresnillo Plc.
Mexico

 | 

2025
Potable Water Supply on Harsh Terrain

Снабжение питьевой водой в труднопроходимой местности

Компания водоснабжения Mekorot / Beit Shemesh Water Company
Израиль

 | 

2017