Efficiency and Durability in Handling Muddy Water

Case Study: Pexgol’s Solution at the Palm Oil Plant.

Case Study Nº

163

Customer

Industrial Aceitera del Casanare
Colombia

|

2023

Working Conditions

Temperature: 90° a 100°C / 104°F | Flow: 40 m³/d | Fluid Components: Muddy water (POME) with a high organic load

Pexgol Pipes

Pexgol 200 mm, class 15

Application

Muddy Water Transport

Lenght

270 m / 885 ft

Categories

Efficiency and Durability in Handling Muddy Water

The Challenge

Industrial Aceitera del Casanare S.A., a palm oil processing plant in Colombia, faced the need to install a new line for the transportation of POME (Palm Oil Mill Effluent) from the plant to the oxidation ponds. This fluid, with a high organic load and operating at temperatures between 90°C and 100°C, posed a significant challenge due to its corrosive and abrasive nature. In 2022, the company had already tested a 100-meter section of Pexgol pipe, achieving excellent results in terms of resistance and durability.

The Solution

To address this challenge, Industrial Aceitera del Casanare decided to use 200 mm, class 15 Pexgol pipes over a length of 270 meters. The choice of Pexgol was based on its great resistance to high temperatures, corrosion, and abrasion, promising a durable and reliable solution for the transportation of POME. The implementation of Pexgol allowed the
plant to reduce downtime, as well as the costs and times associated with maintenance.

The installation of the 270 meters of Pexgol pipe was carried out efficiently using only two GP mechanical joints. This process did not require special tools, which further simplified the installation and minimized disruptions to plant operations. Since the implementation of the new line, Industrial Aceitera del Casanare has experienced a significant improvement in operational efficiency, with a notable reduction in maintenance times and plant downtime.

The success of this project highlights Pexgol’s ability to handle extreme operating conditions and highly corrosive and abrasive fluids.

Related Case Studies

Substitution of a Steel Spool for PE-X Coated for Pumping Formation Water.

Replacement of a Steel Spool with Pexgol

Enap Sipetrol
Ecuador

 | 

2021
Water Drainage in Harsh Ground

Water Drainage at an Open-Cast Mine

Timmins Gold Corp Group, Molimentales del Noroeste Mine
Mexico

 | 

2016
850 Meters of Pipe Replaced in Less Than 24 Hours, Without Affecting Residents.

Goodbye Asbestos: Pexgol Modernizes Thermal Water Network

Raquet Club Lake Chapala
Mexico

 | 

2024
Química del Rey replaced a corroded steel column with a Pexgol line, achieving a faster, safer, and more durable installation.

Reliable Solution for Deep Wells in Corrosive Environments

Química del Rey
Mexico

 | 

2022
Installation of Pexgol Pipe for the Transport of Abrasive Tailings.

Abrasive Tailings Transport

Pirquitas Mine
Argentina

 | 

2015
Replacement of Carbon Steel Pipe for a Pexgol Pipe

Water Transportation

Cargill
Mexico

 | 

2017