Efficiency and Durability in Handling Muddy Water

Case Study: Pexgol’s Solution at the Palm Oil Plant.

Estudo de Caso Nº

163

Cliente

Industrial Aceitera del Casanare
Colombia

|

2023

Condições de Trabalho

Temperature: 90° a 100°C / 104°F | Flow: 40 m³/d | Fluid Components: Muddy water (POME) with a high organic load

Solução Pexgol

Pexgol 200 mm, class 15

Aplicação

Muddy Water Transport

Comprimento

270 m / 885 ft

Categorias

Efficiency and Durability in Handling Muddy Water

The Challenge

Industrial Aceitera del Casanare S.A., a palm oil processing plant in Colombia, faced the need to install a new line for the transportation of POME (Palm Oil Mill Effluent) from the plant to the oxidation ponds. This fluid, with a high organic load and operating at temperatures between 90°C and 100°C, posed a significant challenge due to its corrosive and abrasive nature. In 2022, the company had already tested a 100-meter section of Pexgol pipe, achieving excellent results in terms of resistance and durability.

The Solution

To address this challenge, Industrial Aceitera del Casanare decided to use 200 mm, class 15 Pexgol pipes over a length of 270 meters. The choice of Pexgol was based on its great resistance to high temperatures, corrosion, and abrasion, promising a durable and reliable solution for the transportation of POME. The implementation of Pexgol allowed the
plant to reduce downtime, as well as the costs and times associated with maintenance.

The installation of the 270 meters of Pexgol pipe was carried out efficiently using only two GP mechanical joints. This process did not require special tools, which further simplified the installation and minimized disruptions to plant operations. Since the implementation of the new line, Industrial Aceitera del Casanare has experienced a significant improvement in operational efficiency, with a notable reduction in maintenance times and plant downtime.

The success of this project highlights Pexgol’s ability to handle extreme operating conditions and highly corrosive and abrasive fluids.

Estudos de Caso Relacionados

Installation of a Pexgol Line 200 Meters Deep at an Underground Mine

Transport of Compressed Air

Meridian Mine – Faena El Peñón
Chile

 | 

2018
Installation of a Drainage System between Dams in a Copper Mine.

Water Transport Between Dams

CODELCO – El Teniente Mine
Chile

 | 

2019
Changing carbon steel for efficiency: Pexgol PE-X pipes in Aconcagua Energía

Elevating Efficiency in Hydrocarbon Exploitation

Aconcagua Energía
Argentina

 | 

2023
Installation of Pexgol Pipes for Transporting Hot Water.

Hot Water Supply

Hilton
Israel

 | 

2020
Pan American Energy implements an efficient and sustainable solution for brine transportation.

Fast and Safe Brine Transport in the Salar de Hombre Muerto

Lithos (PAE)
Argentina

 | 

2024
Installation of Pexgol Pipesf for the Drainage of an Underground Mine.

High Pressure Drain in Underground Mine

Ojos del Salado Mine – Lundin Mining
Chile

 | 

2018