Skip to content
Pexgol
  • About Us
  • Products
  • Solutions
  • Distribution Worldwide
  • Case Studies
  • BIM/CAD Library​
  • Contact
  • Request a Quote
×
Pexgol
  • About Us
  • Products
  • Solutions
  • Distribution Worldwide
  • Case Studies
  • BIM/CAD Library​
  • Contact
  • Request a Quote
  • English
    • Spanish
    • Portuguese
    • Russian
Pexgol
  • About Us
  • Products
  • Solutions
  • Distribution Worldwide
  • Case Studies
  • Contact
  • Request a Quote
  • BIM/CAD Library​
×
Pexgol
  • About Us
  • Products
  • Solutions
  • Distribution Worldwide
  • Case Studies
  • Contact
  • Request a Quote
  • BIM/CAD Library​

Water Drainage in Underground Mine

Drainage in Underground Mine with Slopes Between 40° and 90°.

Underground Mine Dewatering

Installation Of Pexgol Hanging Pipes In Underground Mine

Test: Pexgol vs HDPE for Brine Transportation

Test Of Pexgol Pipes Vs Hdpe Pipes For Brine Transportation

Compressed Air Transportation

Replacement of a HDPE Pipe for a Pexgol Pipe

Slurry Transportation

Replacement of a HDPE Pipe for a Pexgol Pipe

Open Cast Mine Dewatering

Water Transportation through Shafts

Recovered Water Transportation

Grey Water Transportation

Open Cast Mine Dewatering

Dewatering without Supports

Slurry Transportation

Replacement of HDPE Pipe for Pexgol

Backfill

Cement Slurry Injection To An Underground Mine
  • Previous
  • 1
  • ...
  • 6
  • 7
  • 8
  • ...
  • 10
  • Next
Pexgol

PEXGOL MAIN OFFICE

Golan Renewable Industries
Kibbutz Shaar HaGolan
1514500, Israel
+972 77 902 1000

PEXGOL MAIN OFFICE

Golan Renewable Industries
Kibbutz Shaar HaGolan
1514500, Israel
+972 77 902 1000

Subscribe to our Newsletter

Follow us on Social media

Linkedin Youtube Envelope

About Us

BIM/CAD Library​

Pexgol Products

Pexgol Solutions

Distribution Wordwide

Case Studies

Contact

Request a Quote

Copyright © 2025 by Golan Renewable Industries LTD. All rights reserved. Ads. Design by  Wirall Interactive

Contact Us

Envelope