Drainage Lines in Underground Mine

Installation of 3000 Meters Of PE-X Pipe for an Underground Mine.

Case Study Nº

73

Customer

Lundin Mining – Candelaria Norte Mine
Chile

|

2020

Working Conditions

Underground work

Pexgol Pipes

Pexgol 160 mm (6”), class 19

Application

Dewatering

Lenght

3000 m

Categories

Installation of 3000 Meters Of PE-X Pipe for an Underground Mine.

The Challenge

Lundin Mining at Calendaria Norte Mine had to install a drainage line for its underground mine, where the main challenge was to pass it through the main ramp of the mine, which is only available once a month during its maintenance (since the operation of the mine cannot be stopped).

Pexgol Solution

The client decided to install 3,000 meters of Pexgol pipe that was supplied in five coils of 600 meters each. Two main maintenances were scheduled, where three coils per day (1800 meters) were unrolled and installed.

Cross-linked polyethylene was chosen because of:

  • Its long-length supply format.
  • Ease of installation, thanks to the flexibility of the pipe that was easy to accommodate in the curves of the interior of the mine.
  • Limited installation times to avoid stopping the mining operation.

Installation was quick and easy, uncoiling the full length of the pipeline and then dragging it into the mine.

Related Case Studies

Transformation in the logistics of formation water.

Aconcagua Energía Implements Pexgol Solutions for Efficiency and Savings

Aconcagua Energía
Argentina

 | 

2023
Installation of a Pexgol Line 200 Meters Deep at an Underground Mine

Transport of Compressed Air

Meridian Mine – Faena El Peñón
Chile

 | 

2018
Replacement of Steel Pipes with Pexgol for Testing Centrifugal Pumps.

Pexgol for Centrifugal Pump Test

Flowserve
Argentina

 | 

2022
Installation of Buried Pipes to Transport Water on a Mining Road.

Water Transportation on a Mining Road

CODELCO – Andina Mine
Chile

 | 

2019
Installation of 3000 Meters Of PE-X Pipe for an Underground Mine.

Drainage Lines in Underground Mine

Lundin Mining – Candelaria Norte Mine
Chile

 | 

2020
Explore how Pexgol pipe replacement addressed the corrosion issue in Gordon Pool’s saltwater delivery system, ensuring efficient operation.

From Steel to Pexgol: A Plumbing Upgrade for Tel Aviv’s Gordon Pool

Gordon Pool
Israel

 | 

2023