Skip to content

Transportation of Water with Solids

Pexgol Pipe Installation for the Transport of Water with Solids (Feathers, Bones, Viscera, Etc.)

Case Study Nº

111

Customer

Kofanor
Mexico

|

2022

Working Conditions

Fluid: process water with solids (feathers, bones, viscera, etc.) | Temperature: 26°C / 78°F | Gravity transport

Pexgol Pipes

Pexgol 6”, class 11

Application

Transport of process water with solids

Lenght

160 m / 524 ft

Categories

Pexgol Pipe Installation for the Transport of Water with Solids (Feathers, Bones, Viscera, Etc.)

The Challenge

Kofanor, a Mexican industrial company dedicated to the transformation of meat waste into flour and oil through a thermal process, resulting in a protein ingredient for the manufacture of animal feed.

Kofanor was looking to install an underground line to transport process water from a manhole to a sump. Two options were contemplated for this project, carbon steel or stainless steel pipes, however the first one was not an option due to the corrosion that they present over time, and stainless steel resulted in a very high operating cost.

Pexgol Solution

It was decided to use Pexgol due to the great facility to carry out the installation, where no joint or sand bed was required for the 140 meters of route where the pipe would be buried. Pexgol was cheaper compared to carbon steel and stainless steel.

Likewise, no special equipment was required to carry out the installation, since the plant had a backhoe and forklift with which they were able to uncoil the pipe without any problem.

Related Case Studies

Substitution of a Steel Spool for PE-X Coated for Pumping Formation Water.

Replacement of a Steel Spool with Pexgol

Enap Sipetrol
Ecuador

 | 

2021
Installation of a Pexgol Pipe on top of a Steel Outdated Pipe

Carriage of Chemicals at Sea Port

Ashdod Sea Port
Israel

 | 

2016
Installation of a Pexgol Line for the Transport of Formation Water in an Oil Company.

Replacement of Metal Pipe with PE-X for Formation Water

Enap Sipetrol Ecuador
Ecuador

 | 

2022
Drainage in Underground Mine with Slopes Between 40° and 90°.

Water Drainage in Underground Mine

NEMISA Mine
Mexico

 | 

2018
Pvc Pipe Replacement by Pexgol

Transportation of sodium sulfide

Magnelec S.A. de C.V.
Mexico

 | 

2018
Installation of a Drainage System in an Open Pit Mine.

Drainage System

BHP Pampa Norte – Cerro Colorado Mine
Chile

 | 

2020