Open Cast Mine Dewatering

Transportation of water with solids from an open cast mine

Case Study Nº

25

Customer

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

|

2013

Working Conditions

Extreme environmental temperatures (-25°C to 40°C).

Pexgol Pipes

Pexgol 225 mm, Class 24 (SDR 7.4).

Application

Mine dewatering.

Lenght

4000 m.

Categories

Transportation of water with solids from an open cast mine

The Challenge

Collahuasi Mine required to transport water from the cast mine. Due to the harsh environmental conditions of the field, the engineering team decided to make a change on the type of material they have been using historically.

Pexgol Solution

A 4,000 meter Pexgol pipe was installed from the bottom of the cast mine to the load area. It required a Pexgol pipe 225 mm Class 24, in long sections of 320 meters that enabled an easy installation.

The Pexgol pipe was design to resist the working life cycle of the dewatering system, without suffering any damages on the pipe itself, the operations or the employees working on it.

Collahuasi Mine has become one of the Golan’s key clients regarding the use of dewatering lines among Chile’s mines. The pipe installed has been in use since 2013 with no failures.

Related Case Studies

Performance evaluation of Pexgol lining under extreme service conditions.

Durable Solution Against Abrasion in Production Facilities: Pexgol at YPF

YPF
Argentina

 | 

2018
The Robust & Flexible Answer to Constantly Changing Mine Surfaces.

Evolving Mine Operations with Pexgol Piping

Peña Colorada
Mexico

 | 

2023
Pexgol Pipe to Transport Effluents at 30°C / 86°F in an Underground Mine.

Pumping Mining Effluents

AngloGold Ashanti
Brazil

 | 

2019
Explore how Pexgol pipe replacement addressed the corrosion issue in Gordon Pool’s saltwater delivery system, ensuring efficient operation.

From Steel to Pexgol: A Plumbing Upgrade for Tel Aviv’s Gordon Pool

Gordon Pool
Israel

 | 

2023
Replacement of Titanium Pipes by Pexgol Pipes to Transport Acid Solution.

Process Plant: Transport of Leached Slurry

Barrick Gold – Pueblo Viejo
Dominican Republic

 | 

2018
Pexgol Pipe for the Transport of Fluorosilicic Acid.

Fluorosilicic Acid Transport

Phosphate Mine – ICL Rotem
Israel

 | 

1995