Slurry Transportation

Replacement of HDPE Pipe for Pexgol

Case Study Nº

36

Customer

Tizapa Mine
Mexico

|

2015

Working Conditions

Pressure 100 Psi; Flow 225 mД/h; Specific Weight 1.2 t; Solids 20-30%.

Pexgol Pipes

Pexgol 10” 250 mm, Class 15 (SDR 11).

Application

Slurry transportation.

Lenght

200 meters.

Categories

Replacement of HDPE Pipe for Pexgol

The Challenge

Tizapa Mine formerly installed an HDPE line were they used to transport slurry. This pipe suffered several failures on the joints, so did the thermo-fusions and the stub-ends as well.

They determinate that the failures were caused by small water hammers on the line.

Pexgol Solution

Due to this special circumstances, Tizapa Mine decided to install Pexgol pipes for the following reasons:

  • Supplied in long lengths coils: Of 100 meters each, reducing possible failures in the joints.
  • It high resistance to water hammers.
  • Burst pressure: 3 times higher than nominal pressure.
  • Safe joints: They don’t deform neither detach caused by a pressure surge.
  • Quick installation: Coils were uncoiled in 1.5 work hours, without any complex equipment.

Related Case Studies

Transport of Muddy Water (Pome) witha High Content of Organic Load.

Transport of Muddy Water in a Palm Oil Processing Plant

La Gloria
Colombia

 | 

2020
Securing the future of gold mining: Newmont Corporation chooses Pexgol for water transport

Newmont’s Water Transportation Revolution with Pexgol Pipes

Newmont Corporation
Argentina

 | 

2018
Pexgol technology can overcome challenges in shallow well applications, offering an efficient and cost-effective solution for leading companies in the agricultural industry.

Success in Agricultural Desalination: Water Supply Challenges

BerryMex
Mexico

 | 

2019
Installation of 3000 Meters Of PE-X Pipe for an Underground Mine.

Drainage Lines in Underground Mine

Lundin Mining – Candelaria Norte Mine
Chile

 | 

2020
Installation of Pexgol Pipe to Transport Fiber Optic Cables.

Fiber Optic Cables Through a Vertical Shaft

Sinohydro
Israel

 | 

2021
600 Meters Installed in a Day: Pexgol Delivers for Kiewit in Power Project.

Pexgol Ensures Water Supply at Mexican Combined-Cycle Power Plant

Kimex
Mexico

 | 

2025