Slurry Transportation

Replacement of HDPE Pipe for Pexgol

Case Study Nº

36

Customer

Tizapa Mine
Mexico

|

2015

Working Conditions

Pressure 100 Psi; Flow 225 mД/h; Specific Weight 1.2 t; Solids 20-30%.

Pexgol Pipes

Pexgol 10” 250 mm, Class 15 (SDR 11).

Application

Slurry transportation.

Lenght

200 meters.

Categories

Replacement of HDPE Pipe for Pexgol

The Challenge

Tizapa Mine formerly installed an HDPE line were they used to transport slurry. This pipe suffered several failures on the joints, so did the thermo-fusions and the stub-ends as well.

They determinate that the failures were caused by small water hammers on the line.

Pexgol Solution

Due to this special circumstances, Tizapa Mine decided to install Pexgol pipes for the following reasons:

  • Supplied in long lengths coils: Of 100 meters each, reducing possible failures in the joints.
  • It high resistance to water hammers.
  • Burst pressure: 3 times higher than nominal pressure.
  • Safe joints: They don’t deform neither detach caused by a pressure surge.
  • Quick installation: Coils were uncoiled in 1.5 work hours, without any complex equipment.

Related Case Studies

Optimization of Water Systems in the Energy Industry.

“Threading” Pexgol Pipes

Pluspetrol
Argentina

 | 

2023
Hot Caustic Line Replacement in Paper Mill

Pulp & Paper Mill

Svetlogorskiy Mill
Russia

 | 

2015
Profertil and the Adaptation to New Chemical Processes with Pexgol.

Efficient Implementation of NaOH Drainage Systems

Pluspetrol
Argentina

 | 

2023
Pexgol helped Profertil to overcome the corrosion challenge in its fire protection network.

From carbon steel to Pexgol: A victory against corrosion

Profertil
Argentina

 | 

2021
Dewatering tThrough Shafts for an Underground Lead-Zinc Mine.

Dewatering Through Shafts

Esan Eczacibasi Endustriyel Hammaddeler
Turkey

 | 

2019
Overcoming Corrosion Challenges in the Oil Industry

Overcoming Corrosion Challenges in the Oil Industry

Petróleos Sudamericanos
Argentina

 | 

2023