Water Transportation

Replacement of Carbon Steel Pipe for a Pexgol Pipe

Case Study Nº

42

Customer

Cargill
Mexico

|

2017

Working Conditions

Work done at -65 meters

Pexgol Pipes

Pexgol 100 mm (4″) SDR 11.

Application

Water transportation.

Lenght

50 meters.

Categories

Replacement of Carbon Steel Pipe for a Pexgol Pipe

The Challenge

In the plant “Purina” the water for production is taken from a well.

Originally they used carbon steel pipes to transport the water, which were useful only for a year, then they had to change the pipes since they suffered serious corrosion problems.

This phenomenon happened due to the high sodium content of the groundwater.

Pexgol Solution

The customer required a flexible pipe with a longer service life than carbon steel pipes to maintain a stable operation and minimize sudden stoppages for maintenance operations.

It was, therefore, decided to supply a pipe of 110 mm diameter in a single section which can withstand without any inconvenience the weight of the pump, the cables, the water column and the weight of the pipe.

Related Case Studies

Installation of a Borehole with Pipe in Sections for Reduced Space.

Installation of Water Well in Reduced Space

Mekorot
Israel

 | 

2020
Reducing maintenance and increasing safety in hydraulic backfill operations.

Pexgol Simplifies Slurry Transportation at Buriticá Mine

Zijin - Continental Gold
Colombia

 | 

2023
Pexgol Pipe for the Transport of Fluorosilicic Acid.

Fluorosilicic Acid Transport

Phosphate Mine – ICL Rotem
Israel

 | 

1995
Dewatering With Low Ph Levels

Open Cast Mine Dewatering

Arcelor Mittal Mine
Mexico

 | 

2016
Cement Slurry Injection to an Underground Mine

Backfill

Aguilar Mine
Argentina

 | 

2015
A Case Study on the Collaborative Engineering and Strategic Implementation of the Pexgol Pipeline System for Public Safety and Efficiency

Innovation in Safety: Pexgol Piping System for LPG Supply

Rawabi City
Israel

 | 

2010