Safe Installation of a 355 mm Mine DewateringLine

A flexible and durable solution designed to adapt to pit benches, operate outdoors, and minimize connection work in difficult-to-access areas.

Estudo de Caso Nº

197

Cliente

MMG
Perú

|

2024

Condições de Trabalho

Temperature: 27°C / 80.6° F | Pressure: 25 bar / 363 psi pumping pressure | Fluid: Mine water, 5% solids, pH 6

Solução Pexgol

Pexgol 355 mm

Aplicação

Mine dewatering

Comprimento

870 m / 2,854 ft

Categorias

Safe Installation of a 355 mm Mine DewateringLine

The Challenge

Las Bambas needed to install a dewatering line capable of transporting mine water at a pumping pressure of 25 bar in an environment characterized by steep slopes, benches, and mining conditions.

The pipeline had to adapt to the irregular terrain geometry and operate safely outdoors, exposed to solar radiation and low temperatures, without needing to be buried.

Another critical requirement was to minimize installation work on the pit slope. Conventional steel or HDPE pipes are typically supplied in sections approximately 12 or 14 m long, which would have required a greater number of field connections. This meant additional labor, longer installation times, and greater exposure of personnel to high-risk work. In addition, every additional joint represented a potential failure point in a location subject to high operating pressures.

The Solution

A 355 mm Pexgol pipe was selected and supplied in coils with continuous sections of up to 90 m.

The coiled format significantly reduced the number of connections required along the 870 m installation. Compared with the shorter sections commonly used in steel or HDPE systems, this solution reduced labor requirements and minimized potential pipeline failure points.

The inherent flexibility of Pexgol pipe allowed the line to follow changes in direction and adapt to the irregular terrain, making it easier to install along the pit benches without burying the pipeline.

Specialized equipment was used for the installation, including a vertical pay-offvunit due to the size and weight of the coils. Connections were completed using electrofusion couplings, stub ends, and flanges installed at the pipe ends. The use of long sections also made it possible to complete numerous joints away from the pit slope, reducing the time personnel spent in difficult-to-access areas and improving overall installation safety.

As a result, Las Bambas obtained a flexible, high-pressure-resistant pipeline suitable for open-air mine operation, with fewer joints, faster installation, and reduced personnel exposure to high-risk work.

Estudos de Caso Relacionados

The Original Design for a Wastewater Treatment Plant included Stainless Steel Pipes, but after discovering the Superior Capabilities of Pexgol Pipes, the Entire Facility was Switched Over.

New Wastewater Treatment Plant with Pexgol Pipes

Wastewater Treatment Plant
Israel

 | 

2022
Hot sylvinite leach at 114°C/237°F

Mineral Processing – Potash Processing Plant

ICL group, Dead Sea Works
Israel

 | 

1987
Transport of Formation Water with Hydrocarbons.

Formation Water Transport

ROCH
Argentina

 | 

2015
Optimization of Water Systems in the Energy Industry.

“Threading” Pexgol Pipes

Pluspetrol
Argentina

 | 

2023
Installation of a Pexgol Line 200 Meters Deep at an Underground Mine

Transport of Compressed Air

Meridian Mine – Faena El Peñón
Chile

 | 

2018
Pexgol technology can overcome challenges in shallow well applications, offering an efficient and cost-effective solution for leading companies in the agricultural industry.

Success in Agricultural Desalination: Water Supply Challenges

BerryMex
Mexico

 | 

2019