Water Drainage at an Open-Cast Mine

Water Drainage in Harsh Ground

Estudo de Caso Nº

32

Cliente

Timmins Gold Corp Group, Molimentales del Noroeste Mine
Mexico

|

2016

Condições de Trabalho

Solar exposure, 14 bars.

Solução Pexgol

Pexgol 225 mm, Class 15 (SDR 11).

Aplicação

Water drainage.

Comprimento

200 m.

Categorias

Water Drainage In Harsh Ground

The Challenge

At “Molimentales” Mine in order to continue with their open-cast mining operations, it was necessary to drainage water from some sections in the ground. Formerly, the mine used an HDPE pipe of 12 meter sections, but they had constant issues due to leaks in the joints.

Pexgol Solution

A Pexgol pipe was provided, in 100 meters sections, in order to have less joints and thereby less leak risks.

Furthermore, the installation was fast and simple due to the lack of welds, and the pipes were dragged with the equipment that the mine already had available.

Estudos de Caso Relacionados

Food Transport Pexgol vs HDPE

Food Transport Pexgol vs HDPE

Marine Farms
Chile

 | 

2017
Transport of Concentrated Alcohol to 86% for the Production of Rum and Brandy

Transportation of Alcohol for the Production of Rum and Brandy

Cuba Ron
Cuba

 | 

2016
Installation of a Drainage System in an Open Pit Mine.

Drainage System

BHP Pampa Norte – Cerro Colorado Mine
Chile

 | 

2020
Installation of Pexgol Pipe to Transport Fiber Optic Cables.

Fiber Optic Cables Through a Vertical Shaft

Sinohydro
Israel

 | 

2021
Installation of a Pexgol Line for the Transport of Formation Water in an Oil Company.

Replacement of Metal Pipe with PE-X for Formation Water

Enap Sipetrol Ecuador
Ecuador

 | 

2022
The mine was facing scaling issues with their existing HDPE pipes, which required replacement every two weeks. The introduction of Pexgol pipes drastically reduced scaling.

Pexgol: Significant Pipe Wall Scale Reduction

Copper Mine
USA

 | 

2022