Skip to content

Optimization of Potable Water Supply for 1,600 residents

Enhanced hydraulic and structural reliability for critical community infrastructure.

Estudo de Caso Nº

188

Cliente

Rincón de la Candelaria
Mexico

|

2025

Condições de Trabalho

Temperature: Ambient | Flow rate: 50 lps (177 m³/h) | Pressure: 242 psi | Fluid composition: Groundwater

Solução Pexgol

Pexgol 6” SDR 9

Aplicação

Potable water transport

Comprimento

630 m / 2066 ft

Categorias

Optimization of Potable Water Supply for 1,600 residents

The Challenge

The Rincón de la Candelaria community, located in the municipality of Atlacomulco, State of Mexico, at 2,614 meters above sea level, relies on a pumping system to supply potable water from a groundwater source, with an operating flow rate of 50 lps (177 m³/h) and working pressure of up to 242 psi.

The existing pipeline, constructed with 6” SDR 9 HDPE 4717 pipe, presented recurring failures at the thermofusion joints.

Despite having protection accessories at the pumping station, the required pipeline route—crossing urbanized areas between houses and roads—prevented the installation of additional surge protection devices.

As a result, the pipeline was exposed to transient pressure increases caused by water hammer phenomena inherent to well operation. These overpressures compromised the structural integrity of the pipeline and caused service interruptions for approximately 1,600 residents.

Additionally, the groundwater contained minerals such as calcium, magnesium, iron, manganese, sodium, potassium, and bicarbonates, which may promote scaling and affect hydraulic performance in conventional systems.

The Solution

A total of 630 meters of 6” SDR 9 Pexgol pipe were installed, integrating into the system a flanged coupling, with the objective of ensuring greater hydraulic stability against water hammer events generated by well operation.

Thanks to its crosslinked molecular structure (PE-Xa), Pexgol provides superior resistance to transient overpressures and dynamic stresses, reducing the risk of failure compared to the previously installed HDPE pipe. This allowed improved operational reliability without modifying the existing route or incorporating additional protection devices.

The installation was carried out with limited resources and with the support of community personnel, under specialized technical supervision. Despite logistical constraints, water supply was restored in just two days, minimizing the impact on the community.

Additionally, the reduced trench depth requirement (0.60 m) allowed installation along the original route, avoiding deep excavations and additional infrastructure removal work. The result was a faster, more efficient solution with extended service life for the potable water system.

Estudos de Caso Relacionados

Substitution of a Steel Spool for PE-X Coated for Pumping Formation Water.

Replacement of a Steel Spool with Pexgol

Enap Sipetrol
Ecuador

 | 

2021
Installation of Pexgol Pipes to Transport Fish.

Fish Discharge Lines

TASA
Peru

 | 

2018

Categorias:

Transport of Concentrated Alcohol to 86% for the Production of Rum and Brandy

Transportation of Alcohol for the Production of Rum and Brandy

Cuba Ron
Cuba

 | 

2016
Changing carbon steel for efficiency: Pexgol PE-X pipes in Aconcagua Energía

Elevating Efficiency in Hydrocarbon Exploitation

Aconcagua Energía
Argentina

 | 

2023
Pexgol’s resistance to scaling and chemicals delivers consistent operation in open-pit mining.

Switch to Pexgol Reduces Downtime in Molybdenum Concentrate Transport

Buena Vista del Cobre
Mexico

 | 

2024
Pexgol Pipe for the Transport of Fluorosilicic Acid.

Fluorosilicic Acid Transport

Phosphate Mine – ICL Rotem
Israel

 | 

1995