Skip to content

Water Transport Between Dams

Installation of a Drainage System between Dams in a Copper Mine.

Estudo de Caso Nº

77

Cliente

CODELCO – El Teniente Mine
Chile

|

2019

Condições de Trabalho

Extreme temperatures -10° to 40°C / 14° to 104°F

Solução Pexgol

Pexgol 160 mm (6”), class 15

Aplicação

Dewatering

Comprimento

5600 m / 18372.7 ft

Categorias

Installation of a Drainage System between Dams in a Copper Mine.

The Challenge

Cooperación del Cobre de Chile (CODELCO) required transporting water from the Barahona dam to a specific sector of the Caletones smelter, located south of the dam. The line was due to be installed in less than 10 weeks.

The distance of the route, in addition to other works being carried out on site and the vehicular flow, made it critical that the pipeline needed to be installed in the shortest time possible.

Pexgol Solution

The client made an economic evaluation, considering the installation time of the HDPE versus PE-X pipes from Pexgol. Pexgol was finally chosen.

The delivery format in coil of long lengths, allowed the totality of meters to be delivered in only 10 coils.
Installation was exceptionally fast. The uncoiling allowed up to 6 drums per day to be released, the sections to be located in their final location and subsequently joined with the relevant couplings, within 6 days.

As for the accessories, 9 electrofusion couplings were used.
The final experience was very satisfying.

Estudos de Caso Relacionados

Case Study: Pexgol’s Solution at the Palm Oil Plant.

Efficiency and Durability in Handling Muddy Water

Industrial Aceitera del Casanare
Colombia

 | 

2023
Installation of a New Pexgol Pipeline to Provide Hot Water for a Electro-Thermal Storage System.

Hot Water Distribution for Solar Technology

Raygen
Australia

 | 

2021
Dewatering With Low Ph Levels

Open Cast Mine Dewatering

Arcelor Mittal Mine
Mexico

 | 

2016
Installation of 3000 Meters Of PE-X Pipe for an Underground Mine.

Drainage Lines in Underground Mine

Lundin Mining – Candelaria Norte Mine
Chile

 | 

2020
Reduced wear and increased durability in the sand cleaning process at KSB de México.

Improving efficiency in steel foundry with Pexgol

KSB de Mexico
Mexico

 | 

2023
Pexgol’s chemical resistance and flexibility outperform HDPE in demanding leach pad operations.

Greater Efficiency and Safety in Leaching with Pexgol Pipes

Barrick Gold Corp.
Argentina

 | 

2025