Skip to content

Replacement of Metal Pipe with PE-X for Formation Water

Installation of a Pexgol Line for the Transport of Formation Water in an Oil Company.

Estudo de Caso Nº

116

Cliente

Enap Sipetrol Ecuador
Ecuador

|

2022

Condições de Trabalho

Pressure: 25 psi | Temperature: 71°C / 160°F

Solução Pexgol

Pexgol 225 (8″), Class 24

Aplicação

Formation water transport

Comprimento

160 m / 525 ft

Categorias

Installation of a Pexgol Line for the Transport of Formation Water in an Oil Company.

The Challenge

Enap Sipetrol Ecuador, is a branch of the Chilean state oil company Enap.

At their plant, they needed to transport formation water with 65,000-70,000 ppm of sodium chloride, which also had high salinity. This formation water has its origin at the outlet of a three-phase separator, up to a water storage tank. The existing metal pipes in the local market that are used for these processes corrode quickly and present leaks along the way. This situation made it necessary to apply chemical treatment to the pipes, with the cost that this represented, and even so, the treatment did not guarantee the integrity of the pipe.

Pexgol Solution

It was decided to use Pexgol pipe due to the working conditions that it can withstand for these applications and that also has a longer lifespan than the metal pipes usually installed, after the tests carried out, it was satisfactorily observed that it has not been any inconvenience, there are no leaks, no presence of corrosion and no solids adhered.

The installation of the 160 m of 225 mm diameter pipe was carried out with the collaboration of 12 people due to its dimensions and weight, in addition, locally manufactured “cradle” type supports were placed. For the assembly of the pipe, a horizontal unwinding machine was used, a crane truck, mobile roller stations for displacement, mechanical keys, torque meter and manual tools, 4 flanged couplings were installed for the terminations with their respective fixing clamps since that line it was installed in 2 sections.

Estudos de Caso Relacionados

Transportation of water in more than 150 mining crossroads

Water Transport on Crossroads

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2012
 How Pexgol streamlined water transportation at Zuccardi Winery

Fast and Reliable Solution for Winemaking Processes

Zuccardi Winery
Argentina

 | 

2024
Water Drainage in Harsh Ground

Water Drainage at an Open-Cast Mine

Timmins Gold Corp Group, Molimentales del Noroeste Mine
Mexico

 | 

2016
Transportation of River Water in Rough Terrain

Water Transport in Complex Terrain

Southern Copper Corporation
Peru

 | 

2019
Adapting to the demands of the process: how Pexgol solves the problems of corrosion and abrasion in the extraction of palm oil.

Implementation of Pexgol Pipelines for the Transport of Muddy Water

IACSA
Colombia

 | 

2023
Installation of a Pexgol Pipe on top of a Steel Outdated Pipe

Carriage of Chemicals at Sea Port

Ashdod Sea Port
Israel

 | 

2016