Skip to content

Tailings Transport with 50% solids

Installation of Pexgol Pipe for Transportation of Mining Tailings.

Estudo de Caso Nº

82

Cliente

Golden Resource Corp. – Don David Gold Mine
Mexico

|

2019

Condições de Trabalho

Ambient temperature | Pressure: up to 320 PSI

Solução Pexgol

Pexgol 110 mm (4″), class 24 | Pexgol 125 mm (5”), class 30

Aplicação

Tailing transport

Comprimento

3600 m / 11811.02 ft

Categorias

Installation of Pexgol Pipe for Transportation of Mining Tailings.

The Challenge

Thanks to the new extraction methods of metals, at Don David Gold mine decided to reprocess the tailings (with 50% solids) of the last 15 years that had been deposited in a dam, in order to extract the minerals that could not be removed at first.

To perform this task, it was necessary to transport the tailings from the dam to the first stage (filter plant). The path where the pipeline needed to be installed was 3600 meters on harsh terrain with more than 190 meters of height difference in descent.

Since the fluid was highly abrasive, one of the fears the engineering team had in designing the line was that it would not resist abrasion and a spill would occur causing large-scale environmental pollution.

Pexgol Solution

The design of the line was carried out by the engineering company Paterson & Cooke and Pexgol was selected for the following reasons:

  • Abrasion resistance (3 to 10 times more than conventional HDPE pipes).
  • Supply of pipes in long sections (coils up to 1000 meters).
  • Fast and safe installation.

The set of qualities for this application, indicated that Pexgol was the safest option due to the possibility of having spills.
Also, for the installation, coils of 500 and 800 meters in length were supplied, therefore the installation was carried out quickly. The joints were made with flanged couplings and alignment clamps, in a place with a steep slope, so the joints had to resist fluid pressure and axial forces.

Estudos de Caso Relacionados

How Pexgol piping improved the fire network system infrastructure in a paint manufacturing plant.

Pexgol Piping for Fire Network System Expansion

Wall
Argentina

 | 

2023
Pexgol: Delivering Rapid, Reliable & Long-lasting Mining Drainage Solutions

Addressing Drainage Challenges with Pexgol

Avino Mine
Mexico

 | 

2023
Pexgol Pipe for the Transport of Fluorosilicic Acid.

Fluorosilicic Acid Transport

Phosphate Mine – ICL Rotem
Israel

 | 

1995
Installation of Pexgol Pipe for Transportation of Mining Tailings.

Tailings Transport with 50% solids

Golden Resource Corp. – Don David Gold Mine
Mexico

 | 

2019
Pexgol pipe was selected for the Assembly of a Muddy Water Transport Line for a Palm Oil Processing Company.

Efficient Choice: PE-X Pipe for the Palm Industry

Extractora Monterrey
Colombia

 | 

2023
Pexgol’s chemical resistance and flexibility outperform HDPE in demanding leach pad operations.

Greater Efficiency and Safety in Leaching with Pexgol Pipes

Barrick Gold Corp.
Argentina

 | 

2025