Concentrated Copper Transportation

Lasta2 Filter Press Feed Lines

Estudo de Caso Nº

33

Cliente

BHP Billiton, Olympic Dam, Australia
Australia

|

2014

Condições de Trabalho

60°C, 9 bars.

Solução Pexgol

Pexgol 180, Class 15 / Pex-Lined Carbon Steel (PLCS) fittings.

Aplicação

Copper transportation.

Comprimento

Short sections.

Categorias

Lasta2 Filter Press Feed Lines

The Challenge

BHP used to transport concentrated copper, through a 6” rubber lined carbon steel (RLCS) and HDPE pipes that suffer from constant abrasion and corrosion.

From the maintenance point of view, repeating leaks were consuming too much time from the team, which could be allocated attending scheduled maintenance operations. So, they required a more resisting pipe material.

Pexgol Solution

Short sections of Pexgol pipe 180 mm, Class 15 with Pex-Lined Carbon Steel (PLCS) fittings were provided. The line installation took a day to layout and a day to assemble. The quick and secured flanged couplers allowed the team to work effectively in multiple locations of the line, without depending on a welding machine, or coordinating special safety zones. The line showed no leakage at start up.

Estudos de Caso Relacionados

Installation of Pexgol Pipe to Transport Fiber Optic Cables.

Fiber Optic Cables Through a Vertical Shaft

Sinohydro
Israel

 | 

2021
Adapting to the demands of the process: how Pexgol solves the problems of corrosion and abrasion in the extraction of palm oil.

Implementation of Pexgol Pipelines for the Transport of Muddy Water

IACSA
Colombia

 | 

2023
Hot Caustic Line Replacement in Paper Mill

Pulp & Paper Mill

Svetlogorskiy Mill
Russia

 | 

2015
Installation of a Pexgol Pipe on top of a Steel Outdated Pipe

Carriage of Chemicals at Sea Port

Ashdod Sea Port
Israel

 | 

2016
A Case Study on the Collaborative Engineering and Strategic Implementation of the Pexgol Pipeline System for Public Safety and Efficiency

Innovation in Safety: Pexgol Piping System for LPG Supply

Rawabi City
Israel

 | 

2010
Transportation of Bauxite Ore Slurry at 95°C / 203°F

Alumina Plant: Ore Slurry Transportation

Urals Alumina Plant – Rusal
Russia

 | 

2013