Tailing Lines

Replacement of Carbon Steel Pipes by Pexgol Pipes for Tailing Lines.

Estudo de Caso Nº

63

Cliente

Ambatovy
Madagascar

|

2017

Condições de Trabalho

Pressure 800Kpa Slurry concentration of 35% solids Temperature 70°C to 80°C Composition (NH4) 2SO4 PH 6-8. Flow 3,200 m³/h (2.3 m/s)

Solução Pexgol

Pexgol 630 mm, Class 15

Aplicação

Slurry transportation

Comprimento

720 m

Categorias

Replacement of Carbon Steel Pipes by Pexgol Pipes for Tailing Lines.

The Challenge

Ambatovy for it nickel mine has 15 km of tailing lines. The tailing distribution lines are made of DN700 carbon steel and this pipelines suffered from repetitive and frequent failures.
This failures were because of the effect of erosion, mainly due to the high liquid velocities inside the pipeline, especially in those areas where there is slack flow in the line.
To a lesser extent, further thinning of the pipeline wall occurs, due the presence of the highly corrosive ammonium sulphate salt (NH4)2SO4 . The frequent failures prompted the decision to replace the the carbon steel tailing pipeline with Pexgol pipes.

Pexgol Solution

After designing the lines in cooperation with Paterson & Cook, Ambatovy decided to install Pexgol 630 mm pipes on 2017.

The pipes were installed down hill from the pumping station where velocities are high. Testing the wall thickness periodically showed minimum effect of wear on the installed Pexgol pipes.

Another advantage that Ambatovy pointed out as a reason to use Pexgol systems is the simplicity of dismantling and reinstalling Pexgol pipes when raising the dam’s level, which saves time and money if comparing this to doing it with carbon steel pipes or carboon steel lined pipes.

Estudos de Caso Relacionados

Guaranteeing an efficient water supply with the Pexgol piping solution in the Mendoza-San Juan Highway project.

Streamlining Water Supply in Highway Construction

Chediack / Ceosa
Argentina

 | 

2023
Reduction of material build-up in brine and brine/acid lines

Mineral Processing – Brine Transportation

SQM,Pedro Valvidia Mine
Chile

 | 

2010
Pvc Pipe Replacement by Pexgol

Transportation of sodium sulfide

Magnelec S.A. de C.V.
Mexico

 | 

2018
Transport Of Lime Slurry At 100°C

Transport of Lime Slurry

Minas de Oro Nacional, Mulatos Mine
Mexico

 | 

2015
Installation of a Drainage System in an Open Pit Mine.

Drainage System

BHP Pampa Norte – Cerro Colorado Mine
Chile

 | 

2020
Dewatering tThrough Shafts for an Underground Lead-Zinc Mine.

Dewatering Through Shafts

Esan Eczacibasi Endustriyel Hammaddeler
Turkey

 | 

2019