Dewatering at an Open Cast Mine
Water Extraction From A Middle Pool To The Exterior Of The Mine
Estudo de Caso Nº
30
Cliente
Codelco, Ministro Hales Division
Chile
|
2016
Condições de Trabalho
Extreme temperatures (-25° to 40°C).
Solução Pexgol
Pexgol 160 mm Class 19 (SDR 9).
Aplicação
Water extraction
Comprimento
400 m.
Categorias

The Challenge
The harsh environmental conditional where Codelco needed to install dewatering lines at the open cast mine, made the engineers opt for a change in their pipe material. They consider Pexgol as an option to decrease the repetitive failures they had with former materials.
Pexgol Solution
A 400 meters Pexgol pipe 160 mm Class 19 was provided, in one section without joints. The Pexgol pipe allowed a quick, reliable and easy installation on the harshest conditions of the open cast mine.
Estudos de Caso Relacionados
Efficient Open Pit Mine Drainage
BHP Escondida Mine
Chile
|
2022
Optimization of Potable Water Supply for 1,600 residents
Rincón de la Candelaria
Mexico
|
2025
Installation of Water Well in Reduced Space
Mekorot
Israel
|
2020
New Wastewater Treatment Plant with Pexgol Pipes
Wastewater Treatment Plant
Israel
|
2022
Pulp & Paper Mill
Svetlogorskiy Mill
Russia
|
2015