Dewatering Through Shafts

Dewatering tThrough Shafts for an Underground Lead-Zinc Mine.

Estudo de Caso Nº

81

Cliente

Esan Eczacibasi Endustriyel Hammaddeler
Turkey

|

2019

Condições de Trabalho

Pressure: 20 bars | Ambient temperature

Solução Pexgol

Pexgol 160 mm (6”), class 24

Aplicação

Dewatering

Comprimento

350 m / 1148.29 ft

Categorias

Dewatering tThrough Shafts for an Underground Lead-Zinc Mine.

The Challenge

Esan had to pump dirty water from -600 meters at their underground lead-zinc mine, through narrow shafts to upper levels of the mine.

They usually used HDPE and steel pipes but they had clogging problems. This time Esan wanted a pipe that will not clog and will be very easy to install, with no need of fittings installed in the narrow shafts. They tried to find alternatives to prevent leakege problems on the fittings that caused to change them many times.

Pexgol Solution

The client decided to install 350 meters of Pexgol pipe. They choose Pexgol due to it’s experience with providing long pipe sections that enable to avoid installing fittings in narrow shafts and because of the resistance of the pipe to scale build up.

Thanks to Pexgol the installation took just 6 hours, Esan reduced their operation downtime.

Esan built their own decoiler and decoiled the pipe by themselves.

Estudos de Caso Relacionados

In an engineering challenge, the Pexgol 225 mm (8”) Class 15 pipe proved to be the perfect solution for transporting tailings at the Mina Capela mining complex.

Environmental Protection and Efficiency in Tailings Management

Mina Capella - Grupo Peñoles
Mexico

 | 

2023
Installation of Pexgol Pipe for Transportation of Mining Tailings.

Tailings Transport with 50% solids

Golden Resource Corp. – Don David Gold Mine
Mexico

 | 

2019
Biodiesel Transport through the Colombian Jungle

Biodiesel Transport

Indupalma (Oro Rojo Plant)
Colombia

 | 

2012
Replacement Of PVC Piping for PE-X in a Industrial Heating System.

Transport of Hot Air for Advanced Agriculture

Teva Post
Israel

 | 

2022
Installation of Pexgol Pipes for Transporting Hot Water.

Hot Water Supply

Hilton
Israel

 | 

2020
Water Drainage in Harsh Ground

Water Drainage at an Open-Cast Mine

Timmins Gold Corp Group, Molimentales del Noroeste Mine
Mexico

 | 

2016