Formation Water Transport

Transport of Formation Water with Hydrocarbons.

Estudo de Caso Nº

55

Cliente

ROCH
Argentina

|

2015

Condições de Trabalho

Formation water with traces of hydrocarbons at 40°C, ambient temperature from -10°C to 30°C

Solução Pexgol

Pexgol 110 mm (4”), Class 12

Aplicação

Formation Water Transport

Comprimento

4000 m

Categorias

Transport of Formation Water with Hydrocarbons.

The Challenge

ROCH is a private company dedicated to the exploration and exploitation of hydrocarbons. As part of their production plans, it was necessary to produce and treat formation water which will then be injected through injection wells for secondary recovery. The purpose of secondary recovery is to maintain reservoir pressure and facilitate the displacement of hydrocarbons to the HC producing well.

The specific challenge was not only to find a pipe material that could support the composition of the fluid, but also to solve the following situations:

– Both the workforce and the heavy equipment, in Santa Cruz (Argentina), are very expensive and represent a very significant portion of the total cost of putting a line of production to work.

– The line had to cross a field belonging to the businessman Benetton, in which sheep are raised to produce wool that is used for his clothes business. Benetton did not allow trenches to remain open during the night (for fear that the animals could fall inside). This situtation, forced to work on sections, opening the trench, installing the pipeline and refilling the trench on the same day.

The pipe options that were handled were steel, HDPE and PE-X.

Pexgol Solution

ROCH decided to install PE-X.

With Pexgol the installation cost dropped drastically reducing the number of operators and their qualifications (no need for professional welders).

In addition, the equipment for the laying of the pipeline is light and not very sophisticated: only a backhoe is used. When installing steel pipes, for example, special equipment must be used.

Furthermore, not only allowed to make a much faster installation, but installation could also be carried out with fewer joints. Both the steel and the HDPE would have required 333 connections and with Pexgol only 13 were eventually needed. This saved costs, labor and time.

The installation was quick and easy despite the harsh weather conditions, and did not require any special tools or equipment.

Regarding the problem of the trenches, Pexgol turned out to be the ideal solution due to the ease and rapidity of laying many meters of pipe in a short time (due to its presentation in rolls).

Estudos de Caso Relacionados

Scale build up reduction - highly concentrated lime solution

Process Water – Brine Transportation

SQM Nueva Victoria-Iquique
Chile

 | 

2010
Acid liquor line with high levels of abrasion and sedimentation

Abrasive Liquid Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2014
Sewage Water Transportation with 300 PPM Hydrogen Peroxide

Sewage Water Transportation

BorsodChem
Hungary

 | 

2011
Replacement of Carbon Steel Pipe for a Pexgol Pipe

Water Transportation

Cargill
Mexico

 | 

2017
Installation of Pexgol Pipesf for the Drainage of an Underground Mine.

High Pressure Drain in Underground Mine

Ojos del Salado Mine – Lundin Mining
Chile

 | 

2018
Delivering Durability and Flexibility for a Sustainable Approach to Space Access.

Pioneering Space Launches with Ground-breaking Piping Solutions

SpinLaunch
USA

 | 

2021