Pexgol’s Solution in Secondary Recovery for EMESA

EMESA Optimizes Formation Water Transportation in Mendoza.

Estudo de Caso Nº

164

Cliente

EMESA
Argentina

|

2023

Condições de Trabalho

Temperature: 40° / 104°F | Flow: 100 m³/d | Pressure: 30 kg/cm² | Fluid components: Formation water

Solução Pexgol

Pexgol 90 mm class 15; 90 mm class 24 & 110 mm class 30

Aplicação

Secondary Recovery

Comprimento

700 m / 2296.59 ft

Categorias

Pexgol’s Solution in Secondary Recovery for EMESA

The Challenge

EMESA, an energy company in the province of Mendoza (Argentina) that participates in some hydrocarbon projects in the province in collaboration with private operators, faced the need to establish a new line for secondary recovery. The project involved transporting formation water from a well with mechanical pumping (AIB) to a tank, operating at a temperature of 40°C, a flow rate of 100 m³/h, and a pressure of 30 kg/cm².

The Solution

To meet the operational requirements of the project, EMESA decided to implement 90 mm class 15, 90 mm class 24, and 110 mm class 30 Pexgol pipes, covering a total length of 700 meters. Pexgol pipes were selected due to their quick installation, material flexibility, lightness, and ease of handling, as well as their ability to supply long sections that simplify the installation process.

The installation of the Pexgol pipes was efficiently carried out in a single day by unrolling the pipes and using double mechanical connectors and flanged couplings. This process was not only fast but also notable for the minimal time required for the installation of mechanical fittings. Pexgol’s ability to handle high pressures and temperatures,
along with its corrosion resistance, ensured reliable and long-lasting operation.

EMESA’s positive experience with Pexgol underscores the importance of choosing high-quality and resistant materials for critical applications in the energy sector

Estudos de Caso Relacionados

Installation of a Borehole with Pipe in Sections for Reduced Space.

Installation of Water Well in Reduced Space

Mekorot
Israel

 | 

2020
Installation Of Pexgol Hanging Pipes In Underground Mine

Underground Mine Dewatering

Codelco Chuquicamata
Chile

 | 

2017
Explore how Pexgol pipe replacement addressed the corrosion issue in Gordon Pool’s saltwater delivery system, ensuring efficient operation.

From Steel to Pexgol: A Plumbing Upgrade for Tel Aviv’s Gordon Pool

Gordon Pool
Israel

 | 

2023
Pexgol Pipe Installation for the Transport of Cyanide Water.

Transport of Cyanide Water

Equinox Gold
Mexico

 | 

2022
Performance evaluation of Pexgol lining under extreme service conditions.

Durable Solution Against Abrasion in Production Facilities: Pexgol at YPF

YPF
Argentina

 | 

2018
Transport of high corrosive material from the thickeners to the neutralization plant

Corrosive Material Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2015