Skip to content

Pexgol’s Solution in Secondary Recovery for EMESA

EMESA Optimizes Formation Water Transportation in Mendoza.

Estudo de Caso Nº

164

Cliente

EMESA
Argentina

|

2023

Condições de Trabalho

Temperature: 40° / 104°F | Flow: 100 m³/d | Pressure: 30 kg/cm² | Fluid components: Formation water

Solução Pexgol

Pexgol 90 mm class 15; 90 mm class 24 & 110 mm class 30

Aplicação

Secondary Recovery

Comprimento

700 m / 2296.59 ft

Categorias

Pexgol’s Solution in Secondary Recovery for EMESA

The Challenge

EMESA, an energy company in the province of Mendoza (Argentina) that participates in some hydrocarbon projects in the province in collaboration with private operators, faced the need to establish a new line for secondary recovery. The project involved transporting formation water from a well with mechanical pumping (AIB) to a tank, operating at a temperature of 40°C, a flow rate of 100 m³/h, and a pressure of 30 kg/cm².

The Solution

To meet the operational requirements of the project, EMESA decided to implement 90 mm class 15, 90 mm class 24, and 110 mm class 30 Pexgol pipes, covering a total length of 700 meters. Pexgol pipes were selected due to their quick installation, material flexibility, lightness, and ease of handling, as well as their ability to supply long sections that simplify the installation process.

The installation of the Pexgol pipes was efficiently carried out in a single day by unrolling the pipes and using double mechanical connectors and flanged couplings. This process was not only fast but also notable for the minimal time required for the installation of mechanical fittings. Pexgol’s ability to handle high pressures and temperatures,
along with its corrosion resistance, ensured reliable and long-lasting operation.

EMESA’s positive experience with Pexgol underscores the importance of choosing high-quality and resistant materials for critical applications in the energy sector

Estudos de Caso Relacionados

Dewatering tThrough Shafts for an Underground Lead-Zinc Mine.

Dewatering Through Shafts

Esan Eczacibasi Endustriyel Hammaddeler
Turkey

 | 

2019
Streamlining Mine Dewatering and Water Transportation with Pexgol Pipes at Cerro Negro Mine.

Overcoming Installation Hurdles and Enhancing Operational Efficiency

Newmont
Argentina

 | 

2022
Transport of acid water at high temperatures

Water Transport with Low pH Level

Moa Nickel S.A. Sherritt
Cuba

 | 

2010
Pexgol’s proposal was clear - to provide a pipe that showcased superior wear resistance, estimated to be three times more durable than HDPE.

Transforming Tailings Transport: The Pexgol Advantage

Lundin Mining
Chile

 | 

2021
Installation Oof Pexgol Pipes through a Chimney for Compressed Air.

Transport of Compressed Air for Underground Mine

HMC Gold
Chile

 | 

2021
Replacement of Carbon Steel Pipes by Pexgol Pipes for Tailing Lines.

Tailing Lines

Ambatovy
Madagascar

 | 

2017