Pexgol’s Solution in Secondary Recovery for EMESA

EMESA Optimizes Formation Water Transportation in Mendoza.

Estudo de Caso Nº

164

Cliente

EMESA
Argentina

|

2023

Condições de Trabalho

Temperature: 40° / 104°F | Flow: 100 m³/d | Pressure: 30 kg/cm² | Fluid components: Formation water

Solução Pexgol

Pexgol 90 mm class 15; 90 mm class 24 & 110 mm class 30

Aplicação

Secondary Recovery

Comprimento

700 m / 2296.59 ft

Categorias

Pexgol’s Solution in Secondary Recovery for EMESA

The Challenge

EMESA, an energy company in the province of Mendoza (Argentina) that participates in some hydrocarbon projects in the province in collaboration with private operators, faced the need to establish a new line for secondary recovery. The project involved transporting formation water from a well with mechanical pumping (AIB) to a tank, operating at a temperature of 40°C, a flow rate of 100 m³/h, and a pressure of 30 kg/cm².

The Solution

To meet the operational requirements of the project, EMESA decided to implement 90 mm class 15, 90 mm class 24, and 110 mm class 30 Pexgol pipes, covering a total length of 700 meters. Pexgol pipes were selected due to their quick installation, material flexibility, lightness, and ease of handling, as well as their ability to supply long sections that simplify the installation process.

The installation of the Pexgol pipes was efficiently carried out in a single day by unrolling the pipes and using double mechanical connectors and flanged couplings. This process was not only fast but also notable for the minimal time required for the installation of mechanical fittings. Pexgol’s ability to handle high pressures and temperatures,
along with its corrosion resistance, ensured reliable and long-lasting operation.

EMESA’s positive experience with Pexgol underscores the importance of choosing high-quality and resistant materials for critical applications in the energy sector

Estudos de Caso Relacionados

Adapting to the demands of the process: how Pexgol solves the problems of corrosion and abrasion in the extraction of palm oil.

Implementation of Pexgol Pipelines for the Transport of Muddy Water

IACSA
Colombia

 | 

2023
Pexgol Fittings for Brine Transportation at a Brazilian Chemical Company.

High Corrosion Resistance Against Brine

Unipar Carbocloro
Brazil

 | 

2019
Delivering Durability and Flexibility for a Sustainable Approach to Space Access.

Pioneering Space Launches with Ground-breaking Piping Solutions

SpinLaunch
USA

 | 

2021
Installation of 3000 Meters Of PE-X Pipe for an Underground Mine.

Drainage Lines in Underground Mine

Lundin Mining – Candelaria Norte Mine
Chile

 | 

2020
Overcoming Corrosion Challenges in the Oil Industry

Overcoming Corrosion Challenges in the Oil Industry

Petróleos Sudamericanos
Argentina

 | 

2023
Water Transport from a Borehole with Low Ph.

Water transport in textile factory

CMT La Laguna
Mexico

 | 

2018