The Challenge
Codelco needed to transport meltdown water downhill at Andes Mountain range.
The water pipes installation was a big risk for the team, as well as huge workforce with short time schedules.
Pexgol Solution
Using hoses seemed to be the solution, but the complexity of its installation made the client decided to use Pexgol in long sections instead.
The installation was simplified by the use of Pexgol long sections.
The pipes were unrolled from it coils and jointed trough electro-fusion, to be dragged and mapped out according to the project.
The installation was done in perfect timing with an optimal performance.
Estudos de Caso Relacionados
Open Cast Mine Dewatering
El Volcan Mine Arcelor Mittal
Mexico
|
2017
Pexgol Piping for Fire Network System Expansion
Wall
Argentina
|
2023
Pexgol Pipes for Efficient Wastewater Transport
Paladini
Argentina
|
2022
Compressed Air System
Rav-Gon Printing House
Israel
|
2020