Condições de Trabalho
Complex & harsh ground, 300 m altitude.
Solução Pexgol
Pexgol 315 mm, Class 15 (SDR 11).
Aplicação
Water transportation.
Comprimento
3,300 m.
Categorias

The Challenge
Codelco needed to transport meltdown water downhill at Andes Mountain range.
The water pipes installation was a big risk for the team, as well as huge workforce with short time schedules.
Pexgol Solution
Using hoses seemed to be the solution, but the complexity of its installation made the client decided to use Pexgol in long sections instead.
The installation was simplified by the use of Pexgol long sections.
The pipes were unrolled from it coils and jointed trough electro-fusion, to be dragged and mapped out according to the project.
The installation was done in perfect timing with an optimal performance.
Estudos de Caso Relacionados
Transport of Cyanide Water
Equinox Gold
Mexico
|
2022
Greater Efficiency and Safety in Leaching with Pexgol Pipes
Barrick Gold Corp.
Argentina
|
2025
Water Drainage at an Underground Mine
El Peñón Yamana Gold, Meridian Mine
Chile
|
2016
Transport of Silica Arena: HDPE vs Pexgol
Covia Corp
Mexico
|
2019