Condições de Trabalho
Complex & harsh ground, 300 m altitude.
Solução Pexgol
Pexgol 315 mm, Class 15 (SDR 11).
Aplicação
Water transportation.
Comprimento
3,300 m.
Categorias

The Challenge
Codelco needed to transport meltdown water downhill at Andes Mountain range.
The water pipes installation was a big risk for the team, as well as huge workforce with short time schedules.
Pexgol Solution
Using hoses seemed to be the solution, but the complexity of its installation made the client decided to use Pexgol in long sections instead.
The installation was simplified by the use of Pexgol long sections.
The pipes were unrolled from it coils and jointed trough electro-fusion, to be dragged and mapped out according to the project.
The installation was done in perfect timing with an optimal performance.
Estudos de Caso Relacionados
Drainage System
BHP Pampa Norte – Cerro Colorado Mine
Chile
|
2020
Vertical Solution for Mine Dewatering in Fresnillo
Fresnillo
Mexico
|
2025
Meltdown Water Transport
Codelco Andina, TADA 1-2 Project
Chile
|
2013
Success in Agricultural Desalination: Water Supply Challenges
BerryMex
Mexico
|
2019
Scaling Up Efficiency: District Energy at Penn State Harrisburg
Penn State University - Harrisburg
USA
|
2021
Compressed Air Transportation
Saucito S.A. de C.V. Mine
Mexico
|
2017