Mine Dewatering at Low Temperature

Vertical Mobile Pexgol Installation on the Rocks for Mine Dewatering.

Estudo de Caso Nº

61

Cliente

Ferrexpo Yeristovo Mining
Ukraine

|

2019

Condições de Trabalho

Vertical installation, ground laying on hills. Ambient temperature: -15°C to 4°C

Solução Pexgol

Pexgol 280 mm (10”), Class 15

Aplicação

Mine Dewatering

Comprimento

360 m

Categorias

Vertical Mobile Pexgol Installation on the Rocks for Mine Dewatering.

The Challenge

Ferrexpo Yeristovo Mining needed to install mobile long sections of pipeline for mine dewatering. They requested that the pipe should have scratch resistance and can be installed on the rocks without any complicate preparations.
They used to work with steel pipes but they presented serious problems such as:

  1. Corrosion
  2. Difficult and expensive installation
  3. Long disassembly and replacement time

Pexgol Solution

The client chose Pexgol pipes with 280 outside diameter, class 15 in coils of 120 meters each with mechanical couplers for a fast and efficient installation. During the installation a 60 ton Hitachi bulldozer and a Manitou telehandler were used for decoiling.

There were 3 separated lines of one piece of 120 meters each without any additional connectors. The only connection was a flange coupler with a pump outlet. Pipes were fixed on top and in the middle by fixpoint clamps as well.

The use of Pexgol pipe solutions allow the client to save costs (manpower and installation time).

Estudos de Caso Relacionados

Installation of a Borehole with Pipe in Sections for Reduced Space.

Installation of Water Well in Reduced Space

Mekorot
Israel

 | 

2020
Installation of a Pexgol Line for the Transport of Formation Water in an Oil Company.

Replacement of Metal Pipe with PE-X for Formation Water

Enap Sipetrol Ecuador
Ecuador

 | 

2022
Improving drainage in the Media Luna mine with Pexgol.

Overcoming Geotechnical Challenges with Pexgol at Media Luna

Minera Media Luna
Mexico

 | 

2023
Transport of high corrosive material from the thickeners to the neutralization plant

Corrosive Material Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2015
Replacement of Carbon Steel Pipes with Pexgol for the Transportation of Natural Gas.

Natural Gas Transportation with Pexgol

YPF
Argentina

 | 

2022
Installation of a New Pexgol Pipeline to Provide Cold Water for a External Chiller System.

Cold Water Distribution for External Cooler System

Chip Manufacturer
Israel

 | 

2022