Skip to content

Optimization of Lithium Brine Transportation

Moving from PVC to Pexgol: Ensuring Efficiency in Lithium Production

Estudo de Caso Nº

143

Cliente

Puna Mining
Argentina

|

2022

Condições de Trabalho

Flow: 77m³/h | Pressure: 60 psi

Solução Pexgol

Pexgol 2”, 5” & 6”, class 15

Aplicação

Transport of raw brine

Comprimento

2 km

Categorias

Optimization of Lithium Brine Transportation

The Challenge

Puna Mining S.A., a pioneer in high-quality battery-grade lithium carbonate production (99.5% purity) in Argentina, faced operational challenges with its brine transportation system. Founded in 2017 by Pablo Alurralde and later forming a joint venture with Argosy Minerals Ltd., the company was committed to utilizing cutting-edge technology in its production processes. However, their existing PVC piping presented significant limitations, requiring constant maintenance, frequent pipe replacements, and struggling with ongoing crystallization issues, which directly affected efficiency and increased operational costs.

Pexgol Solution

Pexgol stepped in with a tailored solution to address Puna Mining’s challenges.
The introduction of Pexgol pipes of 6, 2, and 5 inches over a 2-kilometer stretch was designed to meet the specific demands of raw brine transportation.
The complete installation was accomplished in just three days, highlighting the ease and efficiency of Pexgol pipes.
ArgPex provided on-site training to ensure a smooth and optimized installation process.

Benefits of Switching to Pexgol
By adopting Pexgol pipes, the following advantages were realized:

  • Rapid installation
  • High chemical and corrosion resistance
  • Material flexibility
  • Long lifespan
  • Reduced thermal conductivity
  • Lightweight pipes
  • Availability in long rolls for easier handling and installation

Estudos de Caso Relacionados

Case Study: Pexgol’s Solution at the Palm Oil Plant.

Efficiency and Durability in Handling Muddy Water

Industrial Aceitera del Casanare
Colombia

 | 

2023
Groundwater Transportation With Ph Low Levels

Groundwater Transportation

Grupo México, Buena Vista del Cobre Mine
Mexico

 | 

2015
Transport of Muddy Water (Pome) witha High Content of Organic Load.

Transport of Muddy Water in a Palm Oil Processing Plant

La Gloria
Colombia

 | 

2020
How Pexgol Accelerated the Supply and Installation of a Critical Line.

Comprehensive Water Transportation Solution for Urgent Projects

Madagascar Mining
Madagascar

 | 

2024
Transport of acid slurry at high temperatures

Slurry Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2012
Transportation of Bauxite Ore Slurry at 95°C / 203°F

Alumina Plant: Ore Slurry Transportation

Urals Alumina Plant – Rusal
Russia

 | 

2013