Water Extraction from Wells

Water Extraction From Deep Wells (150 Meters)

Estudo de Caso Nº

27

Cliente

Andacollo Mine
Chile

|

2015

Condições de Trabalho

Extreme environmental temperatures (-5°C to 38°C).

Solução Pexgol

Pexgol 110 mm, Class 24 (SDR 7.4).

Aplicação

Water extraction.

Comprimento

150 m.

Categorias

Water Extraction From Deep Wells (150 Meters)

The Challenge

At Andacollo Mine, the process water was extracted from deep wells through a steel galvanized pipe. This pipes suffered repetitive failures on the joints and required a considerable long installation time. The client requested a pipe that could last longer, in order to minimize the stops at the plant for maintaining purposes.

Pexgol Solution

Golan provided 150 meters of Pexgol pipe 110 mm Class 24 (SDR 7.4) in one section. The pipe, once it was installed, managed to hold the weight of the pump, the cables and the water column, with no efforts.

For the pump maintenance, usually it requires to be extracted from the well. Thanks to Pexgol, Andacollo Mine managed to save time and money, due to the capacity to extract the pipe when is full of water, and there’s no need to do any drain.

Moreover, usually for a steel pipe it would have required more than 25 screwed joints, but with Pexgol it only took 2 (one to the pump and another one to the wellhead).

Estudos de Caso Relacionados

Installation of Pexgol Pipesf for the Drainage of an Underground Mine.

High Pressure Drain in Underground Mine

Ojos del Salado Mine – Lundin Mining
Chile

 | 

2018
Transportation of mixed liquid and corrosive vapor (H2S) from the dehumidifiers

Mineral Processing Corrosive Liquid & Vapor

Moa Nickel S.A. Sherritt
Cuba

 | 

2011
Coarse NACL (SALT) Dredging Tailing

Slurry Lines – Abrasive Dredged Material

ICL group, Dead Sea Works
Israel

 | 

1992
Installation of Pexgol Pipes to Transport Fish.

Fish Discharge Lines

TASA
Peru

 | 

2018

Categorias:

Installation of Buried Pipes to Transport Water on a Mining Road.

Water Transportation on a Mining Road

CODELCO – Andina Mine
Chile

 | 

2019
Profertil and the Adaptation to New Chemical Processes with Pexgol.

Efficient Implementation of NaOH Drainage Systems

Pluspetrol
Argentina

 | 

2023