Skip to content

Pexgol’s Solution for CFE: A Leap in Durability and Efficiency

Transforming water transportation with Pexgol technology

Estudo de Caso Nº

154

Cliente

Comisión Federal de Electricidad
Mexico

|

2023

Condições de Trabalho

Temperature: 30°C / 86°F | Pressure: 8kg

Solução Pexgol

Pexgol 6″, class 15

Aplicação

Sea water transport

Comprimento

150 m / 15748 ft 90° elbows and mechanical flanged joints

Categorias

Pexgol’s Solution for CFE: A Leap inDurability and Efficiency

The Challenge

The Federal Electricity Commission (CFE), Mexico’s leading electricity company, at its Empalme (Sonora) facility, faced significant challenges with its existing stainless steel pipelines used for transporting treated seawater. The saline environment and corrosive nature of seawater led to frequent corrosion of the steel pipes, requiring constant shortterm maintenance efforts. Seawater is used for cooling turbines, so any failure in the line can lead to downtime in production. Replacing stainless steel pipes required skilled welders and large cranes to handle the tubes due to their high weight.

The Solution

Pexgol provided a comprehensive solution with its 6” RD11 pipes, specifically designed for challenging conditions like those at CFE. Pexgol pipes, known for their high chemical resistance and corrosion resistance, offered a robust alternative to stainless steel.

Pexgol’s flanged coupling and elbow fittings facilitated a smooth installation process on the existing rack, and the lightweight nature of Pexgol pipes allowed for easier handling and maneuvering during installation. Quickpipes Systems provided on-site
technical support, ensuring a seamless transition to Pexgol pipes. This solution not only accelerated the installation process but also significantly reduced maintenance needs, thanks to Pexgol’s durability and the long pipe lengths that minimized the need
for joints.

Estudos de Caso Relacionados

Transportation of brackish water to the main pumping station

Water Lines – Harsh Conditions

Dead Sea Works
Israel

 | 

1993
High Pressure Water Transport for a Gold Mine.

High Pressure Water Transport

Mansfield Mine
Argentina

 | 

2019
Test Installation for Transporting Silica Sand.

Transport of Silica Arena: HDPE vs Pexgol

Covia Corp
Mexico

 | 

2019
Transportation of Bauxite Ore Slurry at 95°C / 203°F

Alumina Plant: Ore Slurry Transportation

Urals Alumina Plant – Rusal
Russia

 | 

2013
The mine was facing scaling issues with their existing HDPE pipes, which required replacement every two weeks. The introduction of Pexgol pipes drastically reduced scaling.

Pexgol: Significant Pipe Wall Scale Reduction

Copper Mine
USA

 | 

2022
Optimization of Water Systems in the Energy Industry.

“Threading” Pexgol Pipes

Pluspetrol
Argentina

 | 

2023