Pexgol’s Solution for CFE: A Leap in Durability and Efficiency

Transforming water transportation with Pexgol technology

Estudo de Caso Nº

154

Cliente

Comisión Federal de Electricidad
Mexico

|

2023

Condições de Trabalho

Temperature: 30°C / 86°F | Pressure: 8kg

Solução Pexgol

Pexgol 6″, class 15

Aplicação

Sea water transport

Comprimento

150 m / 15748 ft 90° elbows and mechanical flanged joints

Categorias

Pexgol’s Solution for CFE: A Leap inDurability and Efficiency

The Challenge

The Federal Electricity Commission (CFE), Mexico’s leading electricity company, at its Empalme (Sonora) facility, faced significant challenges with its existing stainless steel pipelines used for transporting treated seawater. The saline environment and corrosive nature of seawater led to frequent corrosion of the steel pipes, requiring constant shortterm maintenance efforts. Seawater is used for cooling turbines, so any failure in the line can lead to downtime in production. Replacing stainless steel pipes required skilled welders and large cranes to handle the tubes due to their high weight.

The Solution

Pexgol provided a comprehensive solution with its 6” RD11 pipes, specifically designed for challenging conditions like those at CFE. Pexgol pipes, known for their high chemical resistance and corrosion resistance, offered a robust alternative to stainless steel.

Pexgol’s flanged coupling and elbow fittings facilitated a smooth installation process on the existing rack, and the lightweight nature of Pexgol pipes allowed for easier handling and maneuvering during installation. Quickpipes Systems provided on-site
technical support, ensuring a seamless transition to Pexgol pipes. This solution not only accelerated the installation process but also significantly reduced maintenance needs, thanks to Pexgol’s durability and the long pipe lengths that minimized the need
for joints.

Estudos de Caso Relacionados

Replacement of a HDPE Pipe for a Pexgol Pipe

Compressed Air Transportation

Saucito S.A. de C.V. Mine
Mexico

 | 

2017
A high-precision maneuver enabled the complete assembly of the system in record time, ensuring safety and operational continuity.

Pexgol Overcomes Extreme Dewatering Conditions in La Ciénega

Fresnillo Plc.
Mexico

 | 

2025
Pvc Pipe Replacement by Pexgol

Transportation of sodium sulfide

Magnelec S.A. de C.V.
Mexico

 | 

2018
Dewatering without Supports

Open Cast Mine Dewatering

El Volcan Mine Arcelor Mittal
Mexico

 | 

2017
The mine was facing scaling issues with their existing HDPE pipes, which required replacement every two weeks. The introduction of Pexgol pipes drastically reduced scaling.

Pexgol: Significant Pipe Wall Scale Reduction

Copper Mine
USA

 | 

2022
Explore how Pexgol pipe replacement addressed the corrosion issue in Gordon Pool’s saltwater delivery system, ensuring efficient operation.

From Steel to Pexgol: A Plumbing Upgrade for Tel Aviv’s Gordon Pool

Gordon Pool
Israel

 | 

2023