Skip to content

Pioneering Space Launches with Ground-breaking Piping Solutions

Delivering Durability and Flexibility for a Sustainable Approach to Space Access.

Estudo de Caso Nº

147

Cliente

SpinLaunch
USA

|

2021

Condições de Trabalho

Temperature: 70°C / 158°F | Flow: 300 gpm, 150 gpm, 100 gpm respectively | Pressure: 80 psi, 90 psi and 120 psi respectively | Components of the fluid: Water

Solução Pexgol

Pexgol 90, 110 & 160 mm, class 15

Aplicação

Water Brake Cooling, Oil Heat Exchanger Cooling, Vacuum System Cooling

Comprimento

750 m / 2460 ft

Categorias

Pioneering Space Launches with Ground-breaking Piping Solutions

The Challenge

SpinLaunch, an avant-garde space technology firm, introduced a radical departure from conventional fuel-based rockets with their electricity-powered kinetic launch system. This inventive approach to space access required not just a sustainable space solution but also a parallel ground-based system that could match its efficiency and robustness. In the high desert conditions, SpinLaunch aimed for a piping solution that was resilient, could be laid both above and below ground, and would survive freezing temperatures without sustaining damage.

Pexgol Solution

Pexgol, with its state-of-the-art PE-X piping solutions, stepped in to address SpinLaunch’s unique requirements. The company’s 90, 110, and 160 mm class 15 pipes, spanning a total of 750 meters, were introduced for water brake cooling, oil heat exchanger cooling, and vacuum system cooling. The pipes, able to endure a temperature of 70°C (158°F) and different flow rates and pressures, primarily carried water as the fluid component. The easy-to-install system offered flexibility, allowing for both subterranean and above-ground installation with minimal elbows.\

The Pexgol pipes, known for their durability, ensured that even in freezing desert temperatures, the contained liquid wouldn’t damage the structure. The efficient design and collaboration between Pexgol and SpinLaunch resulted in a fast, flexible, and long-lasting solution, fitting perfectly with the client’s revolutionary space access approach.

Estudos de Caso Relacionados

The mine was facing scaling issues with their existing HDPE pipes, which required replacement every two weeks. The introduction of Pexgol pipes drastically reduced scaling.

Pexgol: Significant Pipe Wall Scale Reduction

Copper Mine
USA

 | 

2022
Installation of Pexgol Pipes for Transporting Hot Water.

Hot Water Supply

Hilton
Israel

 | 

2020
Transport of Leached Mud from the Treatment Plant to an Oxidation Lagoon

Palm Oil: Transport of Leached Mud

Industria Chiquibul
Guatemala

 | 

2018
Installation of a drainage system between a well and a mining dam.

Drinking Water on Sloping Terrain

AquaMag
Colombia

 | 

2019

Categories:

Pexgol pipe was selected for the Assembly of a Muddy Water Transport Line for a Palm Oil Processing Company.

Efficient Choice: PE-X Pipe for the Palm Industry

Extractora Monterrey
Colombia

 | 

2023
Installation of Pexgol Pipe for the Transport of Abrasive Tailings.

Abrasive Tailings Transport

Pirquitas Mine
Argentina

 | 

2015