Skip to content

Streamlining Effluent Treatment with Pexgol

Innovation and improvement in fluid transportation in the oil and gas industry.

Estudo de Caso Nº

126

Cliente

Pan American Energy
Argentina

|

2023

Condições de Trabalho

Temperature: 50°C / 122°F | Flow: 18 m³/h | Pressure: 6 Kg/cm2g | Density: 1007,2kg/m3 | Total dissolved solids: 180°C 1.750mg/l | Total Petroleum Hydrocarbons: <0,2mg/l | Total hardness: <10mg/l

Solução Pexgol

Pexgol 180 mm (6″), Class 15

Aplicação

Water Transport

Comprimento

2322 m / 7618 ft

Categorias

Innovation and improvement in fluid transportation in the oil and gas industry.

The Challenge

Pan American Energy LLC (PAE), an oil and gas exploration and production company with hydrocarbon reserves in Argentina, Bolivia, and Chile, faced a specific challenge at its waste management center in Argentina.

The goal was to pump the fluid, mostly water, generated in the gas scrubbers and stored in a sump tank to the effluent treatment plant. This fluid had specific characteristics, including a density of 1007.2 kg/m³, Total Dissolved Solids 180ºC of 1,750 mg/l, Total Petroleum Hydrocarbons <0.2 mg/l, and Total Hardness <10 mg/l. The fluid was transported at a temperature of 50°C, a flow rate of 18 m³/h, and a pressure of 6 kg/cm²g.

Pexgol Solution

The chosen solution to overcome this challenge was the 6” (180 mm, Class 15) Pexgol piping, known for its quick installation, lightness, ease of handling, and ability to be transported in long lengths and rolls.

The piping installation process was relatively fast, requiring only 8 days for complete assembly. The pipe was unrolled and fused through electrofusion, a process known for its efficiency. To facilitate the installation and ensure proper functioning, Pexgol provided electrofusion training services, guaranteeing the correct handling and installation of the material.

By opting for Pexgol piping, Pan American Energy was able to efficiently and safely transport the fluid from its sump tank to the effluent treatment plant, demonstrating the effectiveness and adaptability of Pexgol piping to different environments and challenges.

Estudos de Caso Relacionados

Transportation of Bauxite Ore Slurry at 95°C / 203°F

Alumina Plant: Ore Slurry Transportation

Urals Alumina Plant – Rusal
Russia

 | 

2013
Extraction of underground water through wells

Extraction of Underground Water

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2010
Replacement of Carbon Steel Pipes by Pexgol for Fire Fighting Network.

Water Transport for Fire Network

Profertil
Argentina

 | 

2022
Case Study: Pexgol’s Solution at the Palm Oil Plant.

Efficiency and Durability in Handling Muddy Water

Industrial Aceitera del Casanare
Colombia

 | 

2023
Substitution of a Steel Spool for PE-X Coated for Pumping Formation Water.

Replacement of a Steel Spool with Pexgol

Enap Sipetrol
Ecuador

 | 

2021
Pexgol’s Role in Enhancing Guaymas Protein’s Operations.

Transition to Corrosion-Free Diesel Delivery Systems

Guaymas Protein
Mexico

 | 

2023