Transport Of Palm Oil Slurry At 95°C.

Estudo de Caso Nº

57

Cliente

Loma Fresca
Colombia

|

2017

Condições de Trabalho

Fluid at 95°C, 2 bar

Solução Pexgol

Pexgol 63 mm, Class 15

Aplicação

Slurry transportation

Comprimento

150 m

Categorias

Transport Of Palm Oil Slurry At 95°C.

The Challenge

Loma Fresca is an agro-industrial company, dedicated to the transformation and commercialization of products derived from the cultivation of African palm oil.

As part of the production process, the client required to transport the waste from the palm, to be discarded later. First, they used a carbon steel pipe. It suffered from serious sedimentation problems until it was completely covered, requiring constant plant stops both for cleaning and for replacing the pipes, thus influencing the costs and production time.

Pexgol Solution

Loma Fresca required a pipe that on one hand could withstand the high temperatures of the fluid and that at the same time have greater resistance to the incrustation versus the steel pipes they formerly had. They needed a quick and effective installation to not have to stop production for a long time.

Loma Fresca decided the acquisition of the Pexgol pipe system. The installation was carried out in a single day. The line was separated by sections of pipes and was connected with electrofusion elbows.

Estudos de Caso Relacionados

Slurry transportation with high nickel levels

Leached Slurry Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2013
Test Of Pexgol Pipes Vs Hdpe Pipes For Brine Transportation

Test: Pexgol vs HDPE for Brine Transportation

YBL
Bolivia

 | 

2017
Explore how Pexgol pipe replacement addressed the corrosion issue in Gordon Pool’s saltwater delivery system, ensuring efficient operation.

From Steel to Pexgol: A Plumbing Upgrade for Tel Aviv’s Gordon Pool

Gordon Pool
Israel

 | 

2023
Securing the future of gold mining: Newmont Corporation chooses Pexgol for water transport

Newmont’s Water Transportation Revolution with Pexgol Pipes

Newmont Corporation
Argentina

 | 

2018
Installation of 3000 Meters Of PE-X Pipe for an Underground Mine.

Drainage Lines in Underground Mine

Lundin Mining – Candelaria Norte Mine
Chile

 | 

2020
Installation of Pexgol Pipe in a Formation Water Treatment Plant.

Secondary Injection Water Plant

YPF
Argentina

 | 

2020