Transport of Palm Oil Slurry

Transport Of Palm Oil Slurry At 95°C.

Estudo de Caso Nº

57

Cliente

Loma Fresca
Colombia

|

2017

Condições de Trabalho

Fluid at 95°C, 2 bar

Solução Pexgol

Pexgol 63 mm, Class 15

Aplicação

Slurry transportation

Comprimento

150 m

Categorias

Transport Of Palm Oil Slurry At 95°C.

The Challenge

Loma Fresca is an agro-industrial company, dedicated to the transformation and commercialization of products derived from the cultivation of African palm oil.

As part of the production process, the client required to transport the waste from the palm, to be discarded later. First, they used a carbon steel pipe. It suffered from serious sedimentation problems until it was completely covered, requiring constant plant stops both for cleaning and for replacing the pipes, thus influencing the costs and production time.

Pexgol Solution

Loma Fresca required a pipe that on one hand could withstand the high temperatures of the fluid and that at the same time have greater resistance to the incrustation versus the steel pipes they formerly had. They needed a quick and effective installation to not have to stop production for a long time.

Loma Fresca decided the acquisition of the Pexgol pipe system. The installation was carried out in a single day. The line was separated by sections of pipes and was connected with electrofusion elbows.

Estudos de Caso Relacionados

Installation Oof Pexgol Pipes through a Chimney for Compressed Air.

Transport of Compressed Air for Underground Mine

HMC Gold
Chile

 | 

2021
How Pexgol Accelerated the Supply and Installation of a Critical Line.

Comprehensive Water Transportation Solution for Urgent Projects

Madagascar Mining
Madagascar

 | 

2024
850 Meters of Pipe Replaced in Less Than 24 Hours, Without Affecting Residents.

Goodbye Asbestos: Pexgol Modernizes Thermal Water Network

Raquet Club Lake Chapala
Mexico

 | 

2024
Potable Water Supply on Harsh Terrain

Potable Water Supply on Harsh Terrain

Mekorot / Beit Shemesh Water Company
Israel

 | 

2017
Pexgol Pipe for the Transport of Fluorosilicic Acid.

Fluorosilicic Acid Transport

Phosphate Mine – ICL Rotem
Israel

 | 

1995
Water Extraction From Deep Wells (150 Meters)

Water Extraction from Wells

Andacollo Mine
Chile

 | 

2015