Transport of Palm Oil Slurry

Transport Of Palm Oil Slurry At 95°C.

Estudo de Caso Nº

57

Cliente

Loma Fresca
Colombia

|

2017

Condições de Trabalho

Fluid at 95°C, 2 bar

Solução Pexgol

Pexgol 63 mm, Class 15

Aplicação

Slurry transportation

Comprimento

150 m

Categorias

Transport Of Palm Oil Slurry At 95°C.

The Challenge

Loma Fresca is an agro-industrial company, dedicated to the transformation and commercialization of products derived from the cultivation of African palm oil.

As part of the production process, the client required to transport the waste from the palm, to be discarded later. First, they used a carbon steel pipe. It suffered from serious sedimentation problems until it was completely covered, requiring constant plant stops both for cleaning and for replacing the pipes, thus influencing the costs and production time.

Pexgol Solution

Loma Fresca required a pipe that on one hand could withstand the high temperatures of the fluid and that at the same time have greater resistance to the incrustation versus the steel pipes they formerly had. They needed a quick and effective installation to not have to stop production for a long time.

Loma Fresca decided the acquisition of the Pexgol pipe system. The installation was carried out in a single day. The line was separated by sections of pipes and was connected with electrofusion elbows.

Estudos de Caso Relacionados

Installation of Pexgol Pipe for Transportation of Mining Tailings.

Tailings Transport with 50% solids

Golden Resource Corp. – Don David Gold Mine
Mexico

 | 

2019
Enhancing Efficiency and Durability in the Construction of Aerial Pipelines.

Facing the Challenges of the Neuquén Terrain in Argentina

Pluspetrol
Argentina

 | 

2023
Case Study: Pexgol’s Solution at the Palm Oil Plant.

Efficiency and Durability in Handling Muddy Water

Industrial Aceitera del Casanare
Colombia

 | 

2023
Transportation of water with solids from an open cast mine

Open Cast Mine Dewatering

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2013
Installation of Pexgol pipes for the transport of formation water (gas and minerals)

Gas Wells: Formation Water Treatment

Canacol
Colombia

 | 

2018
Installation Oof Pexgol Pipes through a Chimney for Compressed Air.

Transport of Compressed Air for Underground Mine

HMC Gold
Chile

 | 

2021