Skip to content

Transport of Palm Oil Slurry

Transport Of Palm Oil Slurry At 95°C.

Estudo de Caso Nº

57

Cliente

Loma Fresca
Colombia

|

2017

Condições de Trabalho

Fluid at 95°C, 2 bar

Solução Pexgol

Pexgol 63 mm, Class 15

Aplicação

Slurry transportation

Comprimento

150 m

Categorias

Transport Of Palm Oil Slurry At 95°C.

The Challenge

Loma Fresca is an agro-industrial company, dedicated to the transformation and commercialization of products derived from the cultivation of African palm oil.

As part of the production process, the client required to transport the waste from the palm, to be discarded later. First, they used a carbon steel pipe. It suffered from serious sedimentation problems until it was completely covered, requiring constant plant stops both for cleaning and for replacing the pipes, thus influencing the costs and production time.

Pexgol Solution

Loma Fresca required a pipe that on one hand could withstand the high temperatures of the fluid and that at the same time have greater resistance to the incrustation versus the steel pipes they formerly had. They needed a quick and effective installation to not have to stop production for a long time.

Loma Fresca decided the acquisition of the Pexgol pipe system. The installation was carried out in a single day. The line was separated by sections of pipes and was connected with electrofusion elbows.

Estudos de Caso Relacionados

Installation of a Drainage System between a Well and a Mining Dam.

Well Drainage at Mining Dam

CODELCO – El Teniente Mine
Chile

 | 

2019
Transformation in the logistics of formation water.

Aconcagua Energía Implements Pexgol Solutions for Efficiency and Savings

Aconcagua Energía
Argentina

 | 

2023
Innovation and improvement in fluid transportation in the oil and gas industry.

Streamlining Effluent Treatment with Pexgol

Pan American Energy
Argentina

 | 

2023
Pan American Energy implements an efficient and sustainable solution for brine transportation.

Fast and Safe Brine Transport in the Salar de Hombre Muerto

Lithos (PAE)
Argentina

 | 

2024
Water Extraction From Deep Wells (150 Meters)

Water Extraction from Wells

Andacollo Mine
Chile

 | 

2015
Installation of Buried Pipes to Transport Water on a Mining Road.

Water Transportation on a Mining Road

CODELCO – Andina Mine
Chile

 | 

2019