Water Transportation

Replacement of Carbon Steel Pipe for a Pexgol Pipe

Estudo de Caso Nº

42

Cliente

Cargill
Mexico

|

2017

Condições de Trabalho

Work done at -65 meters

Solução Pexgol

Pexgol 100 mm (4″) SDR 11.

Aplicação

Water transportation.

Comprimento

50 meters.

Categorias

Replacement of Carbon Steel Pipe for a Pexgol Pipe

The Challenge

In the plant “Purina” the water for production is taken from a well.

Originally they used carbon steel pipes to transport the water, which were useful only for a year, then they had to change the pipes since they suffered serious corrosion problems.

This phenomenon happened due to the high sodium content of the groundwater.

Pexgol Solution

The customer required a flexible pipe with a longer service life than carbon steel pipes to maintain a stable operation and minimize sudden stoppages for maintenance operations.

It was, therefore, decided to supply a pipe of 110 mm diameter in a single section which can withstand without any inconvenience the weight of the pump, the cables, the water column and the weight of the pipe.

Estudos de Caso Relacionados

Installation of Pexgol Pipes for Drainage in a Vertical Ground

Vertical Dewatering

Ferrexpo Poltava Mining
Ukraine

 | 

2019
Water Transport from a Borehole with Low Ph.

Water transport in textile factory

CMT La Laguna
Mexico

 | 

2018
Installation of Pexgol Pipe for Transportation of Mining Tailings.

Tailings Transport with 50% solids

Golden Resource Corp. – Don David Gold Mine
Mexico

 | 

2019
Sewage Water Transportation with 300 PPM Hydrogen Peroxide

Sewage Water Transportation

BorsodChem
Hungary

 | 

2011
Groundwater Transportation With Ph Low Levels

Groundwater Transportation

Grupo México, Buena Vista del Cobre Mine
Mexico

 | 

2015
Scale build up reduction - highly concentrated lime solution

Process Water – Brine Transportation

SQM Nueva Victoria-Iquique
Chile

 | 

2010