Skip to content

Transport of Cyanide Water

Pexgol Pipe Installation for the Transport of Cyanide Water.

Case Study Nº

112

Customer

Equinox Gold
Mexico

|

2022

Working Conditions

Fluid: Neutralized Solution pH 10-12 – cyanide water | Flow: 1000m3/hr | Suction level: 1352 m3/hr | Discharge level: 1431/1432 m3/hr

Pexgol Pipes

Pexgol 400 mm (16”), class 10 & 15

Application

Transport of cyanide water

Lenght

1475 m / 4839 ft

Categories

Pexgol Pipe Installation for the Transport of Cyanide Water.

The Challenge

Equinox Gold, a Canadian mining company dedicated to gold extraction in different countries, required for its “Los Filos” mining unit to pump from the ADR plant a neutralized solution (cyaninated water) for evaporation through sprinklers. Previously, steel and HDPE pipes were used for this type of application.

The steel suffered from corrosion problems and the HDPE from crystallization, which generated problems in the thermofusions.

Pexgol Solution

It was decided to use Pexgol in sections of 12 meters with electrofusion connections. This way, possible corrosion problems were avoided and the costs of the project were reduced.

The installation was carried out by the same personnel working at the mine with training from the Pexgol technical team.

Related Case Studies

Installation Oof Pexgol Pipes through a Chimney for Compressed Air.

Transport of Compressed Air for Underground Mine

HMC Gold
Chile

 | 

2021
Transportation of water with solids from an open cast mine

Open Cast Mine Dewatering

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2013
An Outdoor Hydrant and Indoor Sprinklers were installed at Guyana Airport

Water Supply & Fire Extinguisher Line

Cheddi Jagan International Airport
Guyana

 | 

2018
Replacement of Carbon Steel Pipes by Pexgol for Fire Fighting Network.

Water Transport for Fire Network

Profertil
Argentina

 | 

2022
Pexgol Transforms Tailings Transportation at Minera San Julián.

Minera San Julián Adopts Pexgol to Improve Water Management

Fresnillo plc
Mexico

 | 

2024
Química del Rey replaced a corroded steel column with a Pexgol line, achieving a faster, safer, and more durable installation.

Reliable Solution for Deep Wells in Corrosive Environments

Química del Rey
Mexico

 | 

2022