Aconcagua Energía Implements Pexgol Solutions for Efficiency and Savings

Transformation in the logistics of formation water.

Caso de Estudio Nº

158

Cliente

Aconcagua Energía
Argentina

|

2023

Condiciones Operativas:

Temperature: 35°C / 95°F | Flow: 80 m³/h | Pressure: 10 kg/m

Tuberías Utilizadas:

Pexgol 90 mm class 15 & 110 mm class 24

Uso:

Injection water transport

Largo:

10,000 m / 32808.4 ft

Categorías:

Aconcagua Energía Implements Pexgol Solutions for Efficiency and Savings

The Challenge

Aconcagua Energía, a prominent independent energy company in Argentina, faced significant challenges in transporting injection water, crucial for its oil operations. Traditionally, formation water was transported by trucks from the treatment plant to the elevated tanks, which not only represented a high operational cost but also involved risks associated with transport and logistical difficulties, especially during adverse weather conditions or certain times of the year. The need for a more efficient, safe, and economical solution was evident.

The Solution

In search of improving operational efficiency and reducing costs, Aconcagua Energía opted for the implementation of an innovative pipeline using 90 and 110 mm Pexgol for a total of 10,000 meters. The choice of Pexgol was due to its recognized advantages in terms of installation speed, material flexibility, lightness and ease of handling, as well as the ability to transport in rolls, which greatly simplified logistics on the ground.
The installation was carried out in stages, minimizing assembly times and optimizing the resources used. Mechanical double connectors and flanged couplings were used, facilitating a safe and efficient integration into the existing system.

The project not only eliminated the dependency on truck transportation but also brought tangible benefits in terms of operational costs and associated risks. The first phase of the installation included the assistance and training of Argpex in unrolling techniques and the use of mechanical connectors. For the later stages, the Aconcagua Energía team was able to carry out the installation autonomously, demonstrating the effectiveness and ease of implementation of the Pexgol system.

Casos de Estudio Relacionados

Descubre cómo el reemplazo de tuberías con Pexgol resolvió los problemas de corrosión en el sistema de entrega de agua salada de la Piscina Gordon, asegurando su funcionamiento eficiente.

De Acero a Pexgol: Una mejora para la Piscina Gordon de Tel Aviv

Gordon Pool
Israel

 | 

2023
Cambiando el acero al carbono por eficiencia: Tuberías PE-X de Pexgol en Aconcagua Energía

Substitución de tuberías de acero al carbono por PE-X de Pexgol

Aconcagua Energía
Argentina

 | 

2023
Instalación de Prueba para Transporte de Arena Sílica.

Transporte de Arena Sílica: Codo HDPE vs Pexgol

Covia Corp
México

 | 

2019
Instalación de Pozo de Agua con Tubería en Tramos para Espacio Reducido.

Instalación de Pozo de Agua en Espacio Reducido

Mekorot
Israel

 | 

2020
Transporte de salmuera a 114°C de temperatura

Transporte de salmuera a 114°C

ICL Group, Mar Muerto
Israel

 | 

1987
Reemplazo de Tubería de PVC por Pexgol

Transporte de Sulfuro de Sodio

Magnelec S.A. de C.V.
México

 | 

2018