Fewer Shutdowns, Greater Efficiency: Pexgol in the Salt Industry

Pexgol extends pipe lifespan and reduces maintenance in salt production.

Estudo de Caso Nº

173

Cliente

Sales del Istmo
Mexico

|

2023

Condições de Trabalho

Temperature: 80°C / 176°F | Pressure: 4 bar

Solução Pexgol

Pexgol 6″, SDR 11

Aplicação

Liquor transport

Comprimento

12 m / 40 ft

Categorias

Fewer Shutdowns, Greater Efficiency: Pexgol in the Salt Industry

The Challenge

Sales del Istmo (SISA), a producer of iodized and fluoridated salt in Veracruz, Mexico, was facing recurring issues with scaling inside their stainless steel pipes used to transport mother liquor—a solution with a high concentration of rock salt dissolved in water.

This scaling led to frequent pipe blockages, causing repeated shutdowns for maintenance or pipe replacement. Plant personnel were forced to strike the stainless steel pipes to restore flow, which accelerated wear and increased operational costs.

The company needed a solution that would extend the service life of the pipelines and prevent costly production interruptions.

The Solution

To tackle this issue, Sales del Istmo decided to install a 12-meter section of 6” Pexgol SDR 11 pipe, aiming to reduce scaling and increase uptime.

Thanks to its molecular structure and low internal roughness, Pexgol prevents buildup and ensures consistent flow.

Test Results
After 9 months of continuous operation, the pipe was dismantled and found to be completely free of scaling, proving its effectiveness under operating conditions of 4 bar (58 psi) and 80°C (176°F).

Installation Process

  • The installation was carried out with the support of the plant’s internal team, without requiring a crane to lift the pipe to the upper structure.
  • Despite having no prior experience with plastic piping, the team was able to cut and assemble the GP flanged couplings in record time.

Thanks to this successful implementation, Sales del Istmo has significantly reduced maintenance costs, minimized production downtime, and improved operational efficiency with a reliable and long-lasting solution.

Estudos de Caso Relacionados

Transportation of River Water in Rough Terrain

Water Transport in Complex Terrain

Southern Copper Corporation
Peru

 | 

2019
Drainage in Underground Mine with Slopes Between 40° and 90°.

Water Drainage in Underground Mine

NEMISA Mine
Mexico

 | 

2018
Replacement of Titanium Pipes by Pexgol Pipes to Transport Acid Solution.

Process Plant: Transport of Leached Slurry

Barrick Gold – Pueblo Viejo
Dominican Republic

 | 

2018
Water Drainage From the Inside of an Underground Mine

Water Drainage at an Underground Mine

El Peñón Yamana Gold, Meridian Mine
Chile

 | 

2016
The innovative solution from Pexgol for Anglo American Peru’s piping challenges.

Navigating extreme conditions with Pexgol’s PE-X pipes

Anglo American Perú
Peru

 | 

2023
Installation of Pexgol Pipes for Drainage in a Vertical Ground

Vertical Dewatering

Ferrexpo Poltava Mining
Ukraine

 | 

2019